We don’t need to discuss Winnetou’s contract here. If there are building authorities in northeast Brandenburg that approve this, they probably can because they are not as overloaded as in other areas. Here in Schleswig-Holstein, it’s no longer possible, and certainly not in Hesse either.
Does anyone have another photo?
Otherwise, here is our entrance area. Steffen, what do you think of it? Karsten
Does anyone have another photo?
Otherwise, here is our entrance area. Steffen, what do you think of it? Karsten
D
daniels8727 Aug 2017 22:34ypg schrieb:
Anything under 7 months is negligent.
Additives to make, for example, screed dry faster cost unnecessary money and should be avoided.
What’s the use if the builder rushes everything? That guarantees shoddy workmanship.
There are clients who refuse the 3-month option from Viebrockhaus and intentionally choose a longer construction period. It worked out within that timeframe for us (including the basement). We only used fast-setting screed in the boiler room. But that’s common, right? Didn’t seem like shoddy work to me. Just well organized without long waiting times.
Today I finally had time to start working on the workshop in the basement. I immediately reused leftover kitchen countertop material.
W
winnetou7828 Aug 2017 03:23A dream [emoji106]
Nordlys schrieb:
We don’t need to discuss Winnetou’s contract here. If there are building authorities in northeast Brandenburg that agree to this, they probably can do it there because they are not as overloaded as elsewhere. Here in Schleswig-Holstein, it’s no longer possible, and definitely not in Hesse either.
Does anyone have another photo? 
Otherwise, here is our entrance area. Steffen, what do you think? KarstenIsn’t there a hole at the top in the middle???
I would file a complaint about this controlled residential ventilation system. Water is leaking inside.
Otherwise, nice house, good location.
At 10 a.m., the foundation slab will be poured, and this morning additional reinforcement was installed in the transition area between the foundation slab and the retaining wall.

Otherwise, nice house, good location.
At 10 a.m., the foundation slab will be poured, and this morning additional reinforcement was installed in the transition area between the foundation slab and the retaining wall.
- Previous
- 1
- 2
- 3
- 10
- 20
- 30
- 40
- 50
- 60
- 70
- 80
- 90
- 100
- 110
- 120
- 130
- 140
- 143
- 144
- 145
- 146
- 147
- 148
- 149
- 150
- 151
- 152
- 153
- 160
- 170
- 180
- 190
- 200
- 210
- 220
- 230
- 240
- 250
- 260
- 270
- 280
- 290
- 300
- 310
- 320
- 330
- 340
- 350
- 360
- 370
- 380
- 390
- 400
- 410
- 420
- 430
- 440
- 450
- 460
- 470
- 480
- 490
- 500
- 510
- 520
- 530
- 540
- 550
- 560
- 570
- 580
- 590
- 600
- 610
- 620
- 630
- 640
- 650
- 660
- 670
- 680
- 690
- 700
- 710
- 720
- 730
- 740
- 750
- 760
- 770
- 780
- 790
- 800
- 810
- 820
- 830
- 840
- 850
- 860
- 870
- 880
- 890
- 900
- 910
- 920
- 930
- 940
- 950
- 960
- 970
- 980
- 990
- 1000
- 1010
- 1020
- 1030
- 1040
- 1050
- 1060
- 1070
- 1080
- 1090
- 1100
- 1110
- 1120
- 1130
- 1140
- 1150
- 1160
- 1170
- 1180
- 1190
- 1200
- 1210
- 1220
- 1230
- 1240
- 1250
- 1260
- 1270
- 1280
- 1290
- 1300
- 1310
- 1320
- 1330
- 1340
- 1350
- 1360
- 1370
- 1380
- 1390
- 1400
- 1410
- 1420
- 1430
- 1440
- 1450
- 1460
- 1470
- 1480
- 1490
- 1500
- 1510
- 1520
- 1530
- 1540
- 1550
- 1560
- 1570
- 1580
- 1590
- 1600
- 1610
- 1620
- 1630
- 1640
- 1650
- 1660
- 1670
- 1680
- 1690
- 1700
- 1710
- 1720
- 1730
- 1740
- 1750
- 1760
- 1770
- 1780
- 1790
- 1800
- 1810
- 1820
- 1830
- 1840
- 1850
- 1860
- 1870
- 1880
- 1890
- 1900
- 1910
- 1920
- 1930
- 1940
- 1950
- 1960
- 1970
- 1980
- 1981
- 1982
- 1983
- Next
Similar topics