ᐅ House Photos Discussion Corner – Share Your Home Pictures!

Created on: 25 Nov 2015 10:27
K
Koempy
Hello,

It would be really great if everyone here could just post one or a few pictures showing the current state of their house.

I'll start right away.

For renovations, it’s best to provide a comparison of before and after the remodeling.

Before March 2014:



After May 2015:

S
Stephan—
17 May 2021 18:53
Jochen104 schrieb:

Then I’ll join in as well:

Exterior landscaping will be done next year. The final plaster coat is planned for the year after next.
May I ask how you constructed the roofed area? We want to build something similar, and our architect recommended a solid concrete ceiling for the garage to keep it monolithic.

I’m guessing your entire construction was timber frame, since the windows wrap around the corner!?
O
Obermuh
24 May 2021 08:37
The atrium is finally “finished.” Unfortunately, it’s already clear that the floorboards were not installed completely flat, resulting in a slight unevenness… annoying. I’m also not really happy with the individual boards at the edges (some arranged perpendicular to the main pattern, not connected to the central area), but that was the simplest solution to quickly access the drains for cleaning.

Roof terrace with olive tree in the center, lounge sofa, wooden table, glass fronts, warm lighting.


It will do for now, but I’ll have to revisit it at some point.
I
Isokrates
4 Jun 2021 12:17
Here are some recent pictures of our project.
Currently, work is progressing on the exterior landscaping.
Inside, the bathrooms will be fully plastered next week, and the electrical installations will be completed.

White concrete support under cantilever, building site with gravel, yellow cable lies on the ground, rural surroundings.


Modern white single-family house with large glass sliding door, building site surrounded.


Modern two-story house with white facade and gray textured plaster, construction surroundings.


Modern white villa with glass frontage and covered entrance, construction phase.
S
Strahleman
5 Jun 2021 08:27
Since last week, our front door has been installed, and yesterday the blower door test was carried out. During the leak detection, four or five small leaks were found that the drywall installer still needs to fix. Despite these leaks, we achieved an n50 value of 0.7 1/h. The tester expects that with the final house and no leaks, we will reach a maximum of 0.6 1/h. For a KFW55 house, I consider this an excellent result, and I am very satisfied with it.

In the past few days, we have also completed some DIY tasks. Among other things, we built a drywall partition to conceal the ventilation ducts of the mechanical ventilation system, and we tiled the basement rooms. Unfortunately, we are still facing major problems with drainage. Our plumber is unsure and is passing on oversized offers from manufacturers to us without proper review. This issue is currently escalating with the general contractor...

Offene Klimakammer-Tür mit lila Isolierpaneel, Ventilator unten, Messgerät links.


Baustellentür aus schwarzem Metall vor Bauwand, Palettenstufen davor, Kabelrollen rechts.


Raum unter Bauarbeiten: grüne Gipskartonplatten mit Fugenmasse; Leiter links im Vordergrund


Kleiner, leerer Technikraum mit grauen Fliesen und blauen Rohren an den Wänden.


Unfertiges Zimmer mit Fliesenboden, Kabelsalat an Wänden und losem Kabelstrang auf dem Boden
B
benediktr
6 Jun 2021 12:09
Yesterday, the 0.5 mm (0.02 inch) topcoat plaster was applied over the lime base plaster. The result is noticeable, and the walls have finally turned white. We have also finished wallpapering and painting the suspended light cove lighting.

Raum im Bau mit weißen Wänden, großem Fenster hinter Folie, offener Durchgang und sichtbaren Kabeln.


Unfertiger Innenraum mit freiliegenden Kabeln, mehreren Steckdosen, Fenster und Leiter.


Moderne schwarze Metalltreppe mit offenen Holzstufen in einem unfertigen Innenraum.


Unfertiger Innenraum mit hängenden Kabeln und schwarzer Glastür, Blick nach grünem Außenbereich


Rohbauzimmer mit Kabeln an der Decke, Bauwerkzeugen und großer Fensterfront mit Blick ins Grüne.
i_b_n_a_n6 Jun 2021 15:39
We’re also making some small progress here. The first layer of plaster is applied, and everything, including the painting, should be finished within 2-3 weeks. The delays were due to the weather (too cold, too wet), and nothing could be done last week because the entire crew was out sick after vaccination. But it’s better to be down due to vaccination than by COVID 😉 The screed on the upper floor has been finished for a week now; on the ground floor, the screed will be poured on Tuesday.


Einfamilienhaus-Baustelle mit Solarpanelen auf dem Dach, Gerüst und Schotterhaufen davor.



Unfertiger Innenraum mit offener Tür zum Balkon, außen Gerüst, Kabel an Wand.



Rohbauzimmer mit Gipskartonwänden und schräger Decke, Fenster links, Steckdosenlöcher sichtbar.



Kabelsalat in einer Bauwand: gelbe, grüne und schwarze Leitungen rund um Holzrahmen