A lot has happened on our construction site this week, but you can't really see it yet.
Sewer work (the old sewer line had to be relocated because it would have run under our house otherwise; our sewer line needed to be installed):

Insulation for the foundation slab was delivered:

Drainage was installed:

We also now have the house connection (the black nipple sticking out of the ground), and everything else has been backfilled:

Next, the pipes for the ground source heat pump with soil activation will be installed (these will be placed under the foundation slab), followed by the foundation slab itself.
Delivery of the components for the wooden basement is planned for September 21; the wooden basement should be erected on September 22 (they will also be working on Saturday morning).
Sewer work (the old sewer line had to be relocated because it would have run under our house otherwise; our sewer line needed to be installed):
Insulation for the foundation slab was delivered:
Drainage was installed:
We also now have the house connection (the black nipple sticking out of the ground), and everything else has been backfilled:
Next, the pipes for the ground source heat pump with soil activation will be installed (these will be placed under the foundation slab), followed by the foundation slab itself.
Delivery of the components for the wooden basement is planned for September 21; the wooden basement should be erected on September 22 (they will also be working on Saturday morning).
dertill schrieb:
Living room facing south with glass front, kitchen facing north. How does your heat pump manage without a bypass valve so that the living room doesn’t get excessively warm and the kitchen doesn’t become too cold?A properly adjusted underfloor heating system in a modern energy-efficient house has such low supply temperatures that, in this scenario, a heating system without a bypass valve will tend to cool the living room and transfer the "excess" energy to the cooler kitchen.
Yesterday, the precast ceiling panels were delivered to our site.

Unfortunately, the installation boxes were not included in the delivery. Now there are just holes. The reinforcement was supposed to be installed today, and I planned to lay the conduits over the weekend. The in-situ concrete was scheduled for Tuesday.
Of course, none of this will be possible now.
Unfortunately, the installation boxes were not included in the delivery. Now there are just holes. The reinforcement was supposed to be installed today, and I planned to lay the conduits over the weekend. The in-situ concrete was scheduled for Tuesday.
Of course, none of this will be possible now.
- Previous
- 1
- 2
- 3
- 10
- 20
- 30
- 40
- 50
- 60
- 70
- 80
- 90
- 100
- 110
- 120
- 130
- 140
- 150
- 160
- 170
- 180
- 190
- 200
- 210
- 220
- 230
- 240
- 250
- 260
- 270
- 280
- 290
- 300
- 310
- 320
- 330
- 340
- 350
- 360
- 370
- 380
- 390
- 400
- 410
- 420
- 430
- 440
- 450
- 460
- 470
- 480
- 490
- 500
- 510
- 520
- 530
- 540
- 550
- 560
- 570
- 580
- 590
- 600
- 610
- 611
- 612
- 613
- 614
- 615
- 616
- 617
- 618
- 619
- 620
- 621
- 630
- 640
- 650
- 660
- 670
- 680
- 690
- 700
- 710
- 720
- 730
- 740
- 750
- 760
- 770
- 780
- 790
- 800
- 810
- 820
- 830
- 840
- 850
- 860
- 870
- 880
- 890
- 900
- 910
- 920
- 930
- 940
- 950
- 960
- 970
- 980
- 990
- 1000
- 1010
- 1020
- 1030
- 1040
- 1050
- 1060
- 1070
- 1080
- 1090
- 1100
- 1110
- 1120
- 1130
- 1140
- 1150
- 1160
- 1170
- 1180
- 1190
- 1200
- 1210
- 1220
- 1230
- 1240
- 1250
- 1260
- 1270
- 1280
- 1290
- 1300
- 1310
- 1320
- 1330
- 1340
- 1350
- 1360
- 1370
- 1380
- 1390
- 1400
- 1410
- 1420
- 1430
- 1440
- 1450
- 1460
- 1470
- 1480
- 1490
- 1500
- 1510
- 1520
- 1530
- 1540
- 1550
- 1560
- 1570
- 1580
- 1590
- 1600
- 1610
- 1620
- 1630
- 1640
- 1650
- 1660
- 1670
- 1680
- 1690
- 1700
- 1710
- 1720
- 1730
- 1740
- 1750
- 1760
- 1770
- 1780
- 1790
- 1800
- 1810
- 1820
- 1830
- 1840
- 1850
- 1860
- 1870
- 1880
- 1890
- 1900
- 1910
- 1920
- 1930
- 1940
- 1950
- 1960
- 1970
- 1980
- 1981
- 1982
- 1983
- Next
Similar topics