It would be really great if everyone here could just post one or a few pictures showing the current state of their house.

I'll start right away.

For renovations, it’s best to provide a comparison of before and after the remodeling.

Before March 2014:



After May 2015:

N
neubau2019
3 Dec 2019 08:14
-XIII- schrieb:

We are unfortunately not that far along yet. Today, the foundation slab was poured, but starting Thursday, the project will finally begin to take on a three-dimensional shape. I hope the onset of winter holds off a bit longer. The goal for the year is to reach the basement ceiling.

The exterior walls are being quickly formed and poured, so that should be done by Christmas.
-
-XIII-
3 Dec 2019 08:46
Climbee schrieb:

So now we have permanent frost – I hope it’s still warmer where you are.

During the day, temperatures are around 5°C (41°F), but at night it has already frozen. I hope the concrete can withstand this.
tomtom793 Dec 2019 09:00
If this is taken into account, concrete can be given a kind of frost protection, so it performs well even at below-freezing temperatures.
L
ludwig88sta
3 Dec 2019 11:12
Mellina schrieb:

The walls are formwork and poured... I have no idea about the costs, the architect and site manager/master builder planned that ops:

Silly question, but how are channels for cables/pipes etc. actually cut into concrete walls?
Compared to aerated concrete, it’s already quite difficult with brick.
L
Lumpi_LE
3 Dec 2019 11:35
Milled or cut. It is labor-intensive, so conduit pipes and boxes are often installed directly into the formwork.
N
neubau2019
3 Dec 2019 11:37
I think the electrical boxes and conduits should be installed before pouring the concrete... at least that’s how we did it.