R.Hotzenplotz24 May 2018 20:27@zrgrvsh
I see that the joints between your precast concrete ceiling elements have already been finished. Is that part of the contract for the ground floor / upper floor shell construction? I’ve received the invoice for this phase, and I’m surprised to see open joints... I wanted to raise a complaint but then thought maybe it’s included in the interim payment for interior plastering. But now, seeing your work, I’m wondering about it again...
You are also using Poroton bricks. With our Poroton bricks, after completing the ground floor / upper floor, there are various holes in the bricks; some have already been plastered over, but many remain open. Here too, I’m wondering if this is something handled at the plastering interim payment stage or if it must be completed before releasing the payment for the ground floor / upper floor shell construction.
Here are a few pictures showing how it looks this evening...










I see that the joints between your precast concrete ceiling elements have already been finished. Is that part of the contract for the ground floor / upper floor shell construction? I’ve received the invoice for this phase, and I’m surprised to see open joints... I wanted to raise a complaint but then thought maybe it’s included in the interim payment for interior plastering. But now, seeing your work, I’m wondering about it again...
You are also using Poroton bricks. With our Poroton bricks, after completing the ground floor / upper floor, there are various holes in the bricks; some have already been plastered over, but many remain open. Here too, I’m wondering if this is something handled at the plastering interim payment stage or if it must be completed before releasing the payment for the ground floor / upper floor shell construction.
Here are a few pictures showing how it looks this evening...
G
Goldi0911124 May 2018 21:56For us, the interior plastering work was done later as well.
R.Hotzenplotz schrieb:
@zrgrvsh
I see that the joints between your precast concrete ceiling elements have already been filled. Is that part of the contract for the construction of the ground floor / upper floor shell? I have received the invoice for this construction phase and I am wondering about the open joints… I wanted to raise a complaint but then thought maybe that is included in the partial payment for the interior plastering. However, seeing it done at your place makes me reconsider that question…
You are also using Poroton bricks. In our case, after completing the ground floor / upper floor shell, there are several holes in the bricks. Some have already been plastered over, but many are still open. I am also wondering whether that should be done before the plastering partial payment or if it needs to be completed before releasing the shell construction payment.
Here are a few pictures showing the situation this evening…
R
R.Hotzenplotz24 May 2018 22:46@tomtom79
I assume they will install the sheets there the same way as on the other walls.
I assume they will install the sheets there the same way as on the other walls.
So, quite a bit is happening here at the moment. The bathrooms are currently being tiled, and yesterday and today the floor drain for the guest bathroom and the shower and bathtub for the main bathroom were installed.
We also discussed the exterior plaster today, and measurements were taken for the staircase. Oh, and fiber optic internet has now been connected. Finally, no more 6 Mbit speeds in the future [emoji322][emoji323].
Now our own work begins. We are gradually starting with the walls, ceilings, and floors. Who would have thought there is quite a lot of work involved here [emoji16]. Fortunately, we can take our time mostly in the basement.
Let's see if moving in will work out in July. That would be great for the girls. They’ve been attending the daycare there for over a month now, and many children from the new development area are also there. The street is really lively in the afternoons. It’s full of kids [emoji173].

We also discussed the exterior plaster today, and measurements were taken for the staircase. Oh, and fiber optic internet has now been connected. Finally, no more 6 Mbit speeds in the future [emoji322][emoji323].
Now our own work begins. We are gradually starting with the walls, ceilings, and floors. Who would have thought there is quite a lot of work involved here [emoji16]. Fortunately, we can take our time mostly in the basement.
Let's see if moving in will work out in July. That would be great for the girls. They’ve been attending the daycare there for over a month now, and many children from the new development area are also there. The street is really lively in the afternoons. It’s full of kids [emoji173].
- Previous
- 1
- 2
- 3
- 10
- 20
- 30
- 40
- 50
- 60
- 70
- 80
- 90
- 100
- 110
- 120
- 130
- 140
- 150
- 160
- 170
- 180
- 190
- 200
- 210
- 220
- 230
- 240
- 250
- 260
- 270
- 280
- 290
- 300
- 310
- 320
- 330
- 340
- 350
- 360
- 370
- 380
- 390
- 400
- 410
- 420
- 430
- 438
- 439
- 440
- 441
- 442
- 443
- 444
- 445
- 446
- 447
- 448
- 450
- 460
- 470
- 480
- 490
- 500
- 510
- 520
- 530
- 540
- 550
- 560
- 570
- 580
- 590
- 600
- 610
- 620
- 630
- 640
- 650
- 660
- 670
- 680
- 690
- 700
- 710
- 720
- 730
- 740
- 750
- 760
- 770
- 780
- 790
- 800
- 810
- 820
- 830
- 840
- 850
- 860
- 870
- 880
- 890
- 900
- 910
- 920
- 930
- 940
- 950
- 960
- 970
- 980
- 990
- 1000
- 1010
- 1020
- 1030
- 1040
- 1050
- 1060
- 1070
- 1080
- 1090
- 1100
- 1110
- 1120
- 1130
- 1140
- 1150
- 1160
- 1170
- 1180
- 1190
- 1200
- 1210
- 1220
- 1230
- 1240
- 1250
- 1260
- 1270
- 1280
- 1290
- 1300
- 1310
- 1320
- 1330
- 1340
- 1350
- 1360
- 1370
- 1380
- 1390
- 1400
- 1410
- 1420
- 1430
- 1440
- 1450
- 1460
- 1470
- 1480
- 1490
- 1500
- 1510
- 1520
- 1530
- 1540
- 1550
- 1560
- 1570
- 1580
- 1590
- 1600
- 1610
- 1620
- 1630
- 1640
- 1650
- 1660
- 1670
- 1680
- 1690
- 1700
- 1710
- 1720
- 1730
- 1740
- 1750
- 1760
- 1770
- 1780
- 1790
- 1800
- 1810
- 1820
- 1830
- 1840
- 1850
- 1860
- 1870
- 1880
- 1890
- 1900
- 1910
- 1920
- 1930
- 1940
- 1950
- 1960
- 1970
- 1980
- 1981
- 1982
- 1983
- Next
Similar topics