It would be really great if everyone here could just post one or a few pictures showing the current state of their house.

I'll start right away.

For renovations, it’s best to provide a comparison of before and after the remodeling.

Before March 2014:



After May 2015:

R
R.Hotzenplotz
24 May 2018 20:27
@zrgrvsh

I see that the joints between your precast concrete ceiling elements have already been finished. Is that part of the contract for the ground floor / upper floor shell construction? I’ve received the invoice for this phase, and I’m surprised to see open joints... I wanted to raise a complaint but then thought maybe it’s included in the interim payment for interior plastering. But now, seeing your work, I’m wondering about it again...

You are also using Poroton bricks. With our Poroton bricks, after completing the ground floor / upper floor, there are various holes in the bricks; some have already been plastered over, but many remain open. Here too, I’m wondering if this is something handled at the plastering interim payment stage or if it must be completed before releasing the payment for the ground floor / upper floor shell construction.

Here are a few pictures showing how it looks this evening...

Interior view of a shell construction with visible wooden roof trusses and block walls.


Wooden roof structure with beam frame being assembled on site, scaffolding visible


Construction site interior with rough brick walls, window opening, ladder and building materials.


Interior of a construction site: red bricks, white blocks, scaffolding pole


Horizontal concrete wall joint with white repair material


Exterior wall cladding with damaged pink panels, cracks and spalling


Unplastered shell wall made of bricks with mortar and damaged areas under construction


Concrete block wall with gap between blocks and wooden roof beams visible


Red brick wall with mortar joints and hole in masonry, shell construction progress


Brick house with scaffolding all around; garden plants and flowers in front.
G
Goldi09111
24 May 2018 21:56
The concrete was poured today


Reinforced foundation slab under construction with steel mesh and wooden forms



Construction site with steel reinforcement grids, orange pipes, and wooden forms at the foundation



Freshly poured concrete floor slab with wooden frame, excavation pit, grassy areas, and houses in the background.



Freshly poured concrete foundation with wooden formwork; excavator at a construction site in the background.



Construction site: freshly poured slab with wooden forms, crane, construction equipment, and stacks of bricks
tomtom7924 May 2018 22:17
@R.Hotzenplotz
Looking at the picture of the partition walls, I wonder how they are connected to the exterior wall? The metal brackets seem to be missing. Or is the wooden batten supposed to hold it?
E
Eldea
24 May 2018 22:27
For us, the interior plastering work was done later as well.
R.Hotzenplotz schrieb:
@zrgrvsh

I see that the joints between your precast concrete ceiling elements have already been filled. Is that part of the contract for the construction of the ground floor / upper floor shell? I have received the invoice for this construction phase and I am wondering about the open joints… I wanted to raise a complaint but then thought maybe that is included in the partial payment for the interior plastering. However, seeing it done at your place makes me reconsider that question…

You are also using Poroton bricks. In our case, after completing the ground floor / upper floor shell, there are several holes in the bricks. Some have already been plastered over, but many are still open. I am also wondering whether that should be done before the plastering partial payment or if it needs to be completed before releasing the shell construction payment.

Here are a few pictures showing the situation this evening…
R
R.Hotzenplotz
24 May 2018 22:46
@tomtom79

I assume they will install the sheets there the same way as on the other walls.
E
Eldea
24 May 2018 23:21
So, quite a bit is happening here at the moment. The bathrooms are currently being tiled, and yesterday and today the floor drain for the guest bathroom and the shower and bathtub for the main bathroom were installed.

We also discussed the exterior plaster today, and measurements were taken for the staircase. Oh, and fiber optic internet has now been connected. Finally, no more 6 Mbit speeds in the future [emoji322][emoji323].

Now our own work begins. We are gradually starting with the walls, ceilings, and floors. Who would have thought there is quite a lot of work involved here [emoji16]. Fortunately, we can take our time mostly in the basement.

Let's see if moving in will work out in July. That would be great for the girls. They’ve been attending the daycare there for over a month now, and many children from the new development area are also there. The street is really lively in the afternoons. It’s full of kids [emoji173].
Bathroom base unit with white tiles, gray floor tiles; yellow faucet on the wall, spirit level next to it.

Unfinished bathroom under construction: white tiles, bathtub filled with water on the right, shower on the left, window.

Unfinished interior with open glass doors leading to the garden; two chairs inside.

Gray-tone color swatches; central card 34335/34336 is marked.

Wall-mounted electrical distribution box with warning sign and green-red cables.