WilhelmRo21 Nov 2019 13:52neubau2019 schrieb:
The formwork will be done in the next few days, and the basement is slowly taking shape...You’re starting quite late in the year. How far do you plan to get by Christmas/winter break?N
neubau201921 Nov 2019 14:12WilhelmRo schrieb:
You are starting quite late in the year. How far do you plan to get by Christmas/winter break?Yes, I would have preferred to start earlier as well. If the weather cooperates, the shell of the building should be completed by Christmas, at least that is the plan...
W
WilhelmRo21 Nov 2019 14:23neubau2019 schrieb:
If the weather cooperates, the shell of the building should be completed by Christmas, at least that’s the plan…Wow, that’s going to be a tight schedule ops:We don’t have a basement but already have the ground floor with an intermediate ceiling and are also hoping to have a closed shell by Christmas. (The roof still needs to go on – hopefully the windows will be installed too)
best regards
WilhelmRo schrieb:
Wow, this is going to be a tight squeeze ops:
We don’t have a basement but already have the ground floor with the intermediate ceiling and hope to have a closed shell by Christmas. (The roof still needs to go on – hopefully the windows will be installed in time as well)
![HausEG.jpeg"]40038[/ATTACH]<br />
<br />
Best regards</blockquote>Last year on November 21st, it looked like this at our place. So, if there’s no frost during the day and no further issues, having a closed shell by Christmas should be doable.<br />
<br />
[ATTACH type="full" alt="Outdoor construction site: Unplastered brick wall with door opening, crane hook hanging down, soil floor.](/attachments/40039/)
Ippebson schrieb:
What kind of outdoor lights do you have there (manufacturer, product name)? Are the bulbs replaceable? I’m still looking for some... Thanks a lot.We have something similar. But the bulbs are definitely replaceable, because we initially had fixed fixtures and one of them stopped working. So we quickly replaced both sides of the house with new up-down spotlights. However, I don’t remember what kind of lamps they are anymore oops: ...but they do exist
Tina mit K schrieb:
Here you can already see our bathtub, even though it doesn’t really show well in the half-finished bathroom.Nice tubypg schrieb:
nice bathtub Thanks. But it's not standard. We removed it with the general contractor and arranged it directly with the plumber. Actually, there were delivery issues, and it was supposed to arrive only in week 50, but fortunately that didn’t happen. I use it at least once a week during winter, and moving in without a bathtub would have been a bit inconvenient for me.
- Previous
- 1
- 2
- 3
- 10
- 20
- 30
- 40
- 50
- 60
- 70
- 80
- 90
- 100
- 110
- 120
- 130
- 140
- 150
- 160
- 170
- 180
- 190
- 200
- 210
- 220
- 230
- 240
- 250
- 260
- 270
- 280
- 290
- 300
- 310
- 320
- 330
- 340
- 350
- 360
- 370
- 380
- 390
- 400
- 410
- 420
- 430
- 440
- 450
- 460
- 470
- 480
- 490
- 500
- 510
- 520
- 530
- 540
- 550
- 560
- 570
- 580
- 590
- 600
- 610
- 620
- 630
- 640
- 650
- 660
- 670
- 680
- 690
- 700
- 710
- 720
- 730
- 740
- 750
- 760
- 770
- 780
- 790
- 800
- 810
- 820
- 830
- 840
- 850
- 860
- 870
- 880
- 890
- 900
- 910
- 920
- 930
- 940
- 950
- 960
- 970
- 980
- 990
- 1000
- 1010
- 1020
- 1030
- 1040
- 1050
- 1060
- 1070
- 1080
- 1090
- 1100
- 1110
- 1120
- 1130
- 1135
- 1136
- 1137
- 1138
- 1139
- 1140
- 1141
- 1142
- 1143
- 1144
- 1145
- 1150
- 1160
- 1170
- 1180
- 1190
- 1200
- 1210
- 1220
- 1230
- 1240
- 1250
- 1260
- 1270
- 1280
- 1290
- 1300
- 1310
- 1320
- 1330
- 1340
- 1350
- 1360
- 1370
- 1380
- 1390
- 1400
- 1410
- 1420
- 1430
- 1440
- 1450
- 1460
- 1470
- 1480
- 1490
- 1500
- 1510
- 1520
- 1530
- 1540
- 1550
- 1560
- 1570
- 1580
- 1590
- 1600
- 1610
- 1620
- 1630
- 1640
- 1650
- 1660
- 1670
- 1680
- 1690
- 1700
- 1710
- 1720
- 1730
- 1740
- 1750
- 1760
- 1770
- 1780
- 1790
- 1800
- 1810
- 1820
- 1830
- 1840
- 1850
- 1860
- 1870
- 1880
- 1890
- 1900
- 1910
- 1920
- 1930
- 1940
- 1950
- 1960
- 1970
- 1980
- 1981
- 1982
- 1983
- Next
Similar topics