So, I was busy with other things last week, so I wasn’t very active here.
The reason:
(Of course, we had to take a photo on site )
But otherwise, a lot has happened:
The technical room is starting to get full; the system for heating (solar, photovoltaic, etc.) is almost complete. The descaling system and the large electrical cabinet, as well as the ventilation system, are still missing. However, I don’t have a picture of those.
Then we got a roof; only the counter battens are missing, and then finally the roof tiles will be installed:

The carport is also almost finished (except for the cladding and, of course, the paving):

When the sun shines as nicely as it has the last few days, you can almost get a sense of space in the living room (and behind the tarp, it’s already nice and cozy warm):

The double casement window in the bathroom already has its frame:

From the outside, it’s really starting to look like a house:

Now we’re just looking forward to the roof being fully finished. It’s already sealed, but the counter battens and the tiles are still missing.
Inside, the electrician is already hard at work. Hopefully, the interior walls will go up soon, then we will do another walk-through with our lighting designer to finalize the last lamps and lighting.
By the end of November/beginning of December, the windows should also be installed, and then there will be a topping-out celebration.
The reason:
(Of course, we had to take a photo on site )
But otherwise, a lot has happened:
The technical room is starting to get full; the system for heating (solar, photovoltaic, etc.) is almost complete. The descaling system and the large electrical cabinet, as well as the ventilation system, are still missing. However, I don’t have a picture of those.
Then we got a roof; only the counter battens are missing, and then finally the roof tiles will be installed:
The carport is also almost finished (except for the cladding and, of course, the paving):
When the sun shines as nicely as it has the last few days, you can almost get a sense of space in the living room (and behind the tarp, it’s already nice and cozy warm):
The double casement window in the bathroom already has its frame:
From the outside, it’s really starting to look like a house:
Now we’re just looking forward to the roof being fully finished. It’s already sealed, but the counter battens and the tiles are still missing.
Inside, the electrician is already hard at work. Hopefully, the interior walls will go up soon, then we will do another walk-through with our lighting designer to finalize the last lamps and lighting.
By the end of November/beginning of December, the windows should also be installed, and then there will be a topping-out celebration.
Climbee schrieb:
So, last week I was busy with other things, so I wasn’t very active here.
The reason:

(of course, we had to take a photo on site )
But a lot has happened otherwise:
The utility room is starting to fill up; the system for heating (solar, photovoltaic, etc.) is almost finished. Only the descaling system, the large electrical cabinet, and the ventilation system are still missing. I don’t have a picture of those yet.
Then we got a roof; only the counter-battening is left, and then the roof tiles will finally go on:

The carport is also almost complete (except for the cladding and, of course, the paving):

When the sun is shining as nicely as it has the past few days, you can almost get a sense of space in the living room (and it’s cozy and warm behind the tarp as well):

The double casement window in the bathroom already has its frame:

From the outside, it’s really starting to look like a house:

Now we’re just looking forward to the roof actually being finished. It’s already watertight, but the counter-battening and the tiles are still missing.
Inside, the electrician is already hard at work. Hopefully, the interior walls will be installed soon, after which we will do a walk-through with our lighting designer to finalize the last lamps and lighting fixtures.
By the end of November/beginning of December, the windows should be installed, and then we will celebrate the roof raising ceremony first. Congratulations!
Climbee schrieb:
and then the topping-out ceremony is celebrated first With wedding cake
Doesn't the groom get impatient if the threshold for carrying the bride over is not finished yet?
https://www.instagram.com/11antgmxde/
https://www.linkedin.com/company/bauen-jetzt/
11ant schrieb:
With a wedding cake
Doesn't the groom get impatient if the threshold for carrying the bride across is not finished yet?The bride wouldn’t want to put the groom through that, even with the nicest threshold.
Thank you for the congratulations!
- Previous
- 1
- 2
- 3
- 10
- 20
- 30
- 40
- 50
- 60
- 70
- 80
- 90
- 100
- 110
- 120
- 130
- 140
- 150
- 160
- 170
- 180
- 190
- 200
- 210
- 220
- 230
- 240
- 250
- 260
- 270
- 280
- 290
- 300
- 310
- 320
- 330
- 340
- 350
- 360
- 370
- 380
- 390
- 400
- 410
- 420
- 430
- 440
- 450
- 460
- 470
- 480
- 490
- 500
- 510
- 520
- 530
- 540
- 550
- 560
- 570
- 580
- 590
- 600
- 610
- 620
- 630
- 640
- 650
- 660
- 670
- 680
- 690
- 700
- 710
- 712
- 713
- 714
- 715
- 716
- 717
- 718
- 719
- 720
- 721
- 722
- 730
- 740
- 750
- 760
- 770
- 780
- 790
- 800
- 810
- 820
- 830
- 840
- 850
- 860
- 870
- 880
- 890
- 900
- 910
- 920
- 930
- 940
- 950
- 960
- 970
- 980
- 990
- 1000
- 1010
- 1020
- 1030
- 1040
- 1050
- 1060
- 1070
- 1080
- 1090
- 1100
- 1110
- 1120
- 1130
- 1140
- 1150
- 1160
- 1170
- 1180
- 1190
- 1200
- 1210
- 1220
- 1230
- 1240
- 1250
- 1260
- 1270
- 1280
- 1290
- 1300
- 1310
- 1320
- 1330
- 1340
- 1350
- 1360
- 1370
- 1380
- 1390
- 1400
- 1410
- 1420
- 1430
- 1440
- 1450
- 1460
- 1470
- 1480
- 1490
- 1500
- 1510
- 1520
- 1530
- 1540
- 1550
- 1560
- 1570
- 1580
- 1590
- 1600
- 1610
- 1620
- 1630
- 1640
- 1650
- 1660
- 1670
- 1680
- 1690
- 1700
- 1710
- 1720
- 1730
- 1740
- 1750
- 1760
- 1770
- 1780
- 1790
- 1800
- 1810
- 1820
- 1830
- 1840
- 1850
- 1860
- 1870
- 1880
- 1890
- 1900
- 1910
- 1920
- 1930
- 1940
- 1950
- 1960
- 1970
- 1980
- 1981
- 1982
- 1983
- Next
Similar topics