Hello everyone!
We have purchased a triangular plot of land. As if that weren’t complicated enough, there is also a large oak tree that must be considered during the planning. In our initial considerations, it quickly became clear that the floor plan will have an L-shape.
Does anyone here have experience with this type of plot and a correspondingly shaped floor plan? What additional information is needed to get meaningful advice?
Best regards
We have purchased a triangular plot of land. As if that weren’t complicated enough, there is also a large oak tree that must be considered during the planning. In our initial considerations, it quickly became clear that the floor plan will have an L-shape.
Does anyone here have experience with this type of plot and a correspondingly shaped floor plan? What additional information is needed to get meaningful advice?
Best regards
Lumpi_LE schrieb:
Only prepare empty conduits, no cables. Either no one will install them for you, or you will have to sign a disclaimer.
Apart from that, you really shouldn’t have no budget for photovoltaic systems, since the system generates more value than it costs. First of all, thank you for the feedback!
“Standard” empty conduits, then?
One more question about the heat pump:
Since we switched to a heat pump at short notice, the heating installer obviously had to revise their quote. We expected the heat pump to be more expensive, but we were quite surprised that the installer also added a significant number of hours.
Is there a general rule of thumb regarding how many additional hours a heat pump installation takes compared to a simple gas or solar system? Assuming the same installation conditions, of course. In my opinion, the extra work can’t possibly be that much more...
Since we switched to a heat pump at short notice, the heating installer obviously had to revise their quote. We expected the heat pump to be more expensive, but we were quite surprised that the installer also added a significant number of hours.
Is there a general rule of thumb regarding how many additional hours a heat pump installation takes compared to a simple gas or solar system? Assuming the same installation conditions, of course. In my opinion, the extra work can’t possibly be that much more...
In my opinion, this is simply a hefty surcharge for no real reason. Our heat pump from Alpha Innotec was fully prepared and operational within 1-2 hours. The components come pre-filled and are basically plug-and-play. Flushing and filling the underfloor heating took longer than that.
Now that the screed has been installed for 2 weeks, we are wondering whether it is better to speed up the drying process with a drying heater or something similar, or just let it dry naturally through air circulation. What is better? Is it true that the screed must be heated at least once using the underfloor heating system? As with all questions, there are many different answers to this one as well...