ᐅ Construction of a 144 sqm bungalow in Fichtenwalde (near Potsdam)

Created on: 16 May 2021 18:56
A
Acof1978
Then I would also like to introduce our building project here and keep you updated.

First, a brief introduction about us. He (42.5 years; controller in healthcare), she (38.5 years; full-time teacher), child (8.75 years; fully dependent). Our household net income is currently about €6,400 (approximately $6,800) plus performance bonuses, 13th-month salary, overtime, etc. We own a 1,462 sqm (15,735 sq ft) plot of land in Fichtenwalde. The remaining debt on the land is €37,000 (about $39,000). According to official land value guidelines, the land is valued at €146,200 (about $156,000) (€100 / sqm). The market price is around €400,000 to €600,000 (recent sale prices). We submitted the building permit application including the land conversion at the end of December. We expect approval by mid to late July.

The construction company is KB Brandis from Jüterbog. External site supervision will be handled by Bauherrenhilfe with 13 appointments.

Now about the house. It will be a 144 sqm (1,550 sq ft) bungalow plus a 12 sqm (130 sq ft) covered terrace with the following additions:
- Ceiling height 3.00 m (9.8 ft)
- Electric roller shutters (including smart home integration)
- Double-sided laminated windows (wood-colored; RC3 security rating)
- Brine-to-water heat pump with ground collectors due to water protection area (Bosch Compress 7800i LW)
- Hydraulic balancing of the underfloor heating
- Controlled residential ventilation with heat recovery (Bosch)
- Motion detectors from a security company
- 13 kWp photovoltaic system, including battery preparation
- 10 m³ (2,650 gal) cistern for rainwater use
- Doorbell with video function
- Wallbox preparation for electric vehicle charging
- Exterior lighting

Floor plan attached.

We have not yet finalized financing (although discussions have taken place). So far, we have invested up to €30,000 (approximately $32,000) from our own savings during the planning phase. This is almost all of our equity. However, we continue to save about €2,750 (approximately $2,920) per month. The monthly mortgage payment is expected to be around €1,650 (about $1,750) plus additional costs of approximately €200-250 (about $210-265) (taking into account the photovoltaic system). This means when we move into the house, we will still have savings of at least €1,500 (about $1,590) per month.

The construction contract will be signed within the next few weeks. The prices (recently discussed with the company) correspond to the offer and commitment as of September 2020.

The price per square meter of the house (according to the latest offer and full specification) will be €2,700 (about $2,870). This includes everything, such as painting, flooring, etc. The overall costs are structured as follows:
House: €378,000 (about $402,000)
Land conversion including reclassification: €25,000 (about $26,600)
Additional building costs: €40,000 (about $42,500)
Outdoor facilities: €25,000 (about $26,600)
Total financing volume: €468,000 (about $498,000)

Grundriss eines Hauses: Wohnzimmer, Küche, Schlaf-/Kinderzimmer, Bad, Flur, Terrasse.
T
Tom1978
29 Oct 2021 13:13
Yaso2.0 schrieb:

Approval for construction.

There won’t be any removal here, as the asphalt was already damaged and it will continue to be used as a walkway afterwards.

In our case, it will be dismantled. Most likely, a driveway will be planned right away.
T
Tom1978
1 Nov 2021 16:57
The main bathroom is finished. That was quick....

Blue portable toilet in a park in front of a forest with autumn leaves on the ground.
Mahri231 Nov 2021 17:07
that was our first "joy" during the construction. The toilet was installed. 😎 🙂

Blue portable toilet next to hedges, yellow hose lying on the ground.
K
kbt09
1 Nov 2021 17:26
Tom1978 schrieb:

Main bathroom is finished.
I think you didn’t really take the view into account 😉 😎
Mahri231 Nov 2021 17:49
Is the toilet located directly on your construction site access road? Will the trees behind it still be removed?
T
Tom1978
1 Nov 2021 17:51
Mahri23 schrieb:

Is the toilet directly on your construction site access road? Will the trees behind it be removed as well?

Yes, they will be removed. I was also wondering why it’s placed there...