ᐅ Construction of a 144 sqm bungalow in Fichtenwalde (near Potsdam)

Created on: 16 May 2021 18:56
A
Acof1978
Then I would also like to introduce our building project here and keep you updated.

First, a brief introduction about us. He (42.5 years; controller in healthcare), she (38.5 years; full-time teacher), child (8.75 years; fully dependent). Our household net income is currently about €6,400 (approximately $6,800) plus performance bonuses, 13th-month salary, overtime, etc. We own a 1,462 sqm (15,735 sq ft) plot of land in Fichtenwalde. The remaining debt on the land is €37,000 (about $39,000). According to official land value guidelines, the land is valued at €146,200 (about $156,000) (€100 / sqm). The market price is around €400,000 to €600,000 (recent sale prices). We submitted the building permit application including the land conversion at the end of December. We expect approval by mid to late July.

The construction company is KB Brandis from Jüterbog. External site supervision will be handled by Bauherrenhilfe with 13 appointments.

Now about the house. It will be a 144 sqm (1,550 sq ft) bungalow plus a 12 sqm (130 sq ft) covered terrace with the following additions:
- Ceiling height 3.00 m (9.8 ft)
- Electric roller shutters (including smart home integration)
- Double-sided laminated windows (wood-colored; RC3 security rating)
- Brine-to-water heat pump with ground collectors due to water protection area (Bosch Compress 7800i LW)
- Hydraulic balancing of the underfloor heating
- Controlled residential ventilation with heat recovery (Bosch)
- Motion detectors from a security company
- 13 kWp photovoltaic system, including battery preparation
- 10 m³ (2,650 gal) cistern for rainwater use
- Doorbell with video function
- Wallbox preparation for electric vehicle charging
- Exterior lighting

Floor plan attached.

We have not yet finalized financing (although discussions have taken place). So far, we have invested up to €30,000 (approximately $32,000) from our own savings during the planning phase. This is almost all of our equity. However, we continue to save about €2,750 (approximately $2,920) per month. The monthly mortgage payment is expected to be around €1,650 (about $1,750) plus additional costs of approximately €200-250 (about $210-265) (taking into account the photovoltaic system). This means when we move into the house, we will still have savings of at least €1,500 (about $1,590) per month.

The construction contract will be signed within the next few weeks. The prices (recently discussed with the company) correspond to the offer and commitment as of September 2020.

The price per square meter of the house (according to the latest offer and full specification) will be €2,700 (about $2,870). This includes everything, such as painting, flooring, etc. The overall costs are structured as follows:
House: €378,000 (about $402,000)
Land conversion including reclassification: €25,000 (about $26,600)
Additional building costs: €40,000 (about $42,500)
Outdoor facilities: €25,000 (about $26,600)
Total financing volume: €468,000 (about $498,000)

Grundriss eines Hauses: Wohnzimmer, Küche, Schlaf-/Kinderzimmer, Bad, Flur, Terrasse.
N
Neubau2022
23 Jun 2022 08:26
The heating-up phase ended yesterday. The meter shows 6,000 kWh. That amounts to nearly €2,000, which I had budgeted for. Of course, additional costs from further work are expected 😎 Finally, no more emptying the construction dryer and ventilating 2-3 times a day :-) But it did have an advantage—you had time to inspect the house thoroughly 😎
N
Neubau2022
24 Jun 2022 11:50
The front door is currently being installed. The lighter side faces inside, the darker side faces outside. The glass becomes reflective when exposed to light.

Large dark wooden door standing at an angle in an unfinished hallway, brick walls, construction tools.


Wooden door with narrow glass panel at the construction site entrance, unfinished walls
N
Neubau2022
24 Jun 2022 13:30
This is how they look once fully installed. I really like them and am very satisfied.

Wooden door with vertical window strip during construction phase, incomplete wall installation visible


Wooden door with narrow glass strip on the left, construction progress; view outside showing trees and street.
N
Neubau2022
27 Jun 2022 20:14
Today, the installation of the ducts for the controlled residential ventilation system began.

A question regarding registration at the house. We now expect to move in around August or rather September. However, we would like to enroll our daughter in the new school starting with the new school year (end of August). For this, registration in the village is required. Is it possible, for example, for my wife and child to register at the house address already, so the child can attend the school in the new year? Or is there anything to consider in this process?

Baustelle Innen: grüne Installationsrohre an der Decke, Dämmung, Tür am Ende.


Renoviertes Zimmer mit Dämmfolie an der Decke, grünen Rohren, Fensterfront und Blick nach außen.


Grüne flexible Lüftungsrohre hängen von der Decke in einem Bau-/Installationsraum; Fenster sichtbar
T
TmMike_2
27 Jun 2022 22:43
Sure, you just officially register to be finished.
N
Neubau2022
28 Jun 2022 07:41
TmMike_2 schrieb:

Sure, you just officially register to finish

Is this possible without any issues even if the house is not yet completely finished? How does the handover of the house work? Does registration now count as acceptance? So many questions 😎