Hello everyone,
due to current circumstances (just before signing), I’m interested in what upgrades or additional features you included—or had to include—beyond the standard package during your house construction, especially when working with a general contractor (GC), and what the price or price difference was for those?
Thank you very much
due to current circumstances (just before signing), I’m interested in what upgrades or additional features you included—or had to include—beyond the standard package during your house construction, especially when working with a general contractor (GC), and what the price or price difference was for those?
Thank you very much
Windows / Doors: $4000
- 4 venetian blinds instead of roller blinds
- New construction sills on garden-facing windows
- Roller shutter bottom rails in RAL 7016
- Various decorative glass panels
- Front door enhanced with double-sided overlay panel
Electrical: $1700
Various power outlets, satellite sockets, ceiling outlets, motion sensor switches, etc.
Bathroom Upper Floor / Guest WC: $3700
- (Upper floor) Rain shower with built-in thermostat
- (Guest WC) Thermostatic mixer tap
- Completely different toilets and washbasins
- Different bathtub
Tiles:
We will even receive a refund of several hundred euros as we stayed under budget
- 4 venetian blinds instead of roller blinds
- New construction sills on garden-facing windows
- Roller shutter bottom rails in RAL 7016
- Various decorative glass panels
- Front door enhanced with double-sided overlay panel
Electrical: $1700
Various power outlets, satellite sockets, ceiling outlets, motion sensor switches, etc.
Bathroom Upper Floor / Guest WC: $3700
- (Upper floor) Rain shower with built-in thermostat
- (Guest WC) Thermostatic mixer tap
- Completely different toilets and washbasins
- Different bathtub
Tiles:
We will even receive a refund of several hundred euros as we stayed under budget
We have also upgraded almost every trade, which has increased the costs accordingly:
+ Brickwork including decorative elements ~ 2600 euros surcharge
+ Roof tiles ~ 2600 euros surcharge
+ Windows/doors, shutters, insect screens, front door ~ 7000 euros surcharge
+ Sanitary fittings for ground floor shower and main bathroom upstairs ~ 7000 euros surcharge
+ Electrical work ~ 4500 euros surcharge
+ Tiles ~ 3000 euros surcharge
+ Brickwork including decorative elements ~ 2600 euros surcharge
+ Roof tiles ~ 2600 euros surcharge
+ Windows/doors, shutters, insect screens, front door ~ 7000 euros surcharge
+ Sanitary fittings for ground floor shower and main bathroom upstairs ~ 7000 euros surcharge
+ Electrical work ~ 4500 euros surcharge
+ Tiles ~ 3000 euros surcharge
H
hampshire5 Nov 2019 10:59During construction in 2001 – purchase of a newly built townhouse from the developer: underfloor heating, bolt staircase, additional roof window, different room layout, floor and wall coverings as well as bathrooms, garages, and outdoor areas; attic conversion with an additional bathroom was carried out or contracted privately.
During construction in 2018/19: building with an architect and managing the trades privately – no standard designs as a starting point.
For both projects, the principle was: the more complex a later solution becomes, the higher the priority to implement it correctly from the very beginning.
During construction in 2018/19: building with an architect and managing the trades privately – no standard designs as a starting point.
For both projects, the principle was: the more complex a later solution becomes, the higher the priority to implement it correctly from the very beginning.
Approximately 3,000.00 euros overall (satellite dish, shower enclosure walls, some small accessories – lockable toilet door)
Additional items not included in the building contract specification:
Earthworks according to geotechnical report + 3,000.00
Painting + 5,500.00
Flooring + 2,500.00
Topsoil + 3,000.00
Outdoor paving work + 10,000.00
Prices from 2016, plus increases up to 2019
In summary, approximately 30,000.00 euros extra for the house
Additional items not included in the building contract specification:
Earthworks according to geotechnical report + 3,000.00
Painting + 5,500.00
Flooring + 2,500.00
Topsoil + 3,000.00
Outdoor paving work + 10,000.00
Prices from 2016, plus increases up to 2019
In summary, approximately 30,000.00 euros extra for the house