The house construction will start soon. Can anyone estimate how much the earthworks will cost or share their experience? How is it usually calculated?
The building site is in Bavaria, 160 sqm (1720 sq ft) plus basement, double garage (not basemented), with what appears to be normal soil at first glance.
G
guckuck2
3 Apr 2019 08:35
If construction is starting "soon," why isn't there an excavation contractor yet? Then you would have fairly concrete figures.
Bauherrin92 schrieb:
How is that calculated?

Based on actual effort and quantities.
>€10,000 with a basement, assuming you cannot reuse the soil elsewhere and it needs to be hauled away.
B
Bauherrin92
3 Apr 2019 08:49
guckuck2 schrieb:
If it’s starting “soon,” why isn’t there an earthworks contractor yet?

We have a meeting with the earthworks contractor on Friday. I wanted to prepare accordingly until then.
guckuck2 schrieb:
>10,000€ with basement

Both the bank and the general contractor have allocated 10,000 € for this item. To me, that seems too low, especially after reading some threads here. And yes, the soil is supposed to be hauled away.
M4rvin3 Apr 2019 08:58
You will only know more details once you have the results of the soil analysis.

We are building without a basement and have Z1.1, so the excavation will cost around 20,000€ (about 21,500 USD). Earthworks are included with the house; I have no idea what they usually cost.
G
guckuck2
3 Apr 2019 09:00
Bauherrin92 schrieb:

Both the bank and the general contractor have estimated €10,000 for this item. Personally, that seems too low to me, especially after reading some threads here. And yes, the soil is supposed to be hauled away.

Yes, it will probably cost more.
If there are additional issues like contamination or pollutants, it can quickly double, as Marvin mentioned.
G
Grantlhaua
3 Apr 2019 09:10
The removal of soil cost us about 7,000€ (around $7,500). However, we have a sloped site and a basement. The earthworks themselves should be included in the shell construction quote. (This was the case for us; I think the total will be around 15,000€ (approximately $16,000).)