ᐅ Construction Report Single-Family Home €1200 per m²

Created on: 14 Jun 2020 12:05
H
hegi___
Hello everyone,

This is the construction report following an earlier thread on floor plan design.

Planned are:
618 m² (6650 sq ft) plot of land
150 m² (1615 sq ft) living space
50 m² (540 sq ft) double garage
Air-to-water heat pump with underfloor and wall heating
Zehnder ventilation system
Exterior blinds in the living room, kitchen, and gallery. Windows anthracite on both inside and outside
Smart home wireless Homematic IP
Planned budget: €300,000 including land and ancillary costs + €30,000 reserve
Plus €12,500 net for a 9.6 kWp photovoltaic system financed separately

Only small regional companies recommended by other builders are being considered.

So far, the following trades have been contracted:

Earthworks: €20,000
Shell construction: €73,000 + €1,000 for the porch above the front door, Wienerberger Poroton T9
Roof: €19,000 + €1,500 scaffolding
Electrical work: €11,000 excluding chiseling work
Window materials: 17 Salamander triple-glazed units + Beck & Heun roller shutters + 5 Selt exterior blinds = €16,000

Quotes received for:
Plastering without decorative finish: €21,000
Bathroom ceramics Villeroy & Boch: €3,000 from Reuter Bathroom Shop
Interior doors Herholz: €2,600
Hörmann front door + garage door: €3,000
Building services materials from the internet: €10,000
Zehnder ventilation unit ComfoAir Q350 TR enthalpy heat exchanger including materials: €4,000 from Selfio
Nobilia kitchen furniture: €5,500, Bosch Series 4 kitchen appliances from Für Uns Shop with 50% discount for €3,500

Modern white villa with dark pitched roof, carport, two cars and front garden.

3D visualization of a modern white house with grey roof, garden and driveway.


Floor plan of a house with kitchen, office, hallway and WC as well as color-coded wiring.


Floor plan of a house with bedroom, child 1, child 2, dressing room, hallway, bathroom and stairs.


Architectural plan: two-story house with floor plans, sections and elevations.


Architectural plan of a house with front, rear, north and south views including measurements.


Construction cost breakdown with land, interim and building costs as well as own work.
S
Snowy36
24 Aug 2020 08:10
I haven’t kept track of where you live, but here in Bavaria, you don’t get five contractors sending you offers to choose from... with three, you call eight times and get nothing, one sends you an offer, and another says they have no availability until 2025... and then you take the one who replies...
11ant24 Aug 2020 13:13
hegi___ schrieb:

And at least 3-5 per trade.
Competent suppliers quickly notice when someone treats "requesting quotes" like a popular pastime purely for entertainment, and are then only too polite to respond with a blunt rejection. The trade is gradually learning to distinguish between "businesspeople" and "deadbeats."
https://www.instagram.com/11antgmxde/
https://www.linkedin.com/company/bauen-jetzt/
H
hegi___
24 Aug 2020 15:21
11ant schrieb:

Experienced providers quickly recognize when someone treats "requesting quotes" as a pastime for their own amusement and are then only polite enough to respond with the clearly written word "a...hole." The craft is slowly learning to distinguish between "merchants" and "blind men."

Then you just have to be a bit smarter...

...I managed it too.
H
hegi___
24 Aug 2020 15:22
Snowy36 schrieb:

I haven’t tracked where you live exactly, but here in Bavaria you won’t get five contractors offering quotes to choose from… for three trades, you call eight times and get nothing, one sends you a quote, and another says they don’t have availability until 2025… and then you just pick the one you have…

Anyway, you still have a price to base your calculations on.
11ant24 Aug 2020 15:34
hegi___ schrieb:

Then you just have to be a bit smarter...

I would question whether it’s really “smart” to underestimate the labor time required by those preparing quotes, just to have more comparative offers to show off in a card game like skat. If we consider decadence as a sign of an empire’s decline, we might soon follow in the footsteps of the Romans.
https://www.instagram.com/11antgmxde/
https://www.linkedin.com/company/bauen-jetzt/
H
hampshire
24 Aug 2020 15:35
In Bavaria, you can also receive multiple offers. You just need to inquire in a way that makes you an attractive client. Key factors are:
  • An exceptional project
  • Setting the desired outcome while allowing freedom in execution
  • Offering the chance for a truly valuable reference
  • Making a personal appearance
  • Being friendly and reliable
  • Contacting only those who are genuinely considered
  • Aiming for and communicating the best value for money or result, not the lowest invoice amount

Responding to an anonymous, generic price request with unclear prospects of winning the contract is a complete waste of time, even in difficult times.