Hello everyone,
some of you might have already followed one of my threads about us having to or being allowed to build our end-terrace house on our own responsibility – depending on how you look at it. This means that we are buying an end-terrace plot (215 sqm (2315 sq ft)) in a new development area in the Rhein-Neckar district and will be building on it ourselves – but in coordination with our two terrace neighbors.
The municipality, which sold the plots through a local resident model, ideally wanted applicants to apply as a complete housing group with several families and then build accordingly with a general contractor, construction manager, or architect. Of course, that didn’t really work out, so now there are only individual applicants and also homeowners.
After we were awarded the plot, the addresses of the other terrace neighbors were shared to discuss certain matters, such as roof style, whether or not to have a basement, etc. It was immediately clear that everyone preferred to do their own thing. However, we were still able to agree that the housing group will have a gable roof with a pitch of 35 to 40 degrees (within this 5-degree range).
As the end house, we will build without a basement, while the middle house and the other end house will have basements. This obviously presents a challenge as we would have to make a deep foundation or simply skip it, and the middle house would have to support us, as we will start construction first. The current agreement with the middle house is that we will build a deeper foundation at his expense, as supporting our house later on would be considerably more expensive for him.
We are currently close to signing with the construction manager, the notarization appointment for the plot is at the end of June, and we hope to start construction in the fall of this year. Meanwhile, several other freely planned housing groups are being built around us, which might get in the way with their cranes.
I will document the progress here from time to time – such a self-planned terraced house doesn’t come along very often.
some of you might have already followed one of my threads about us having to or being allowed to build our end-terrace house on our own responsibility – depending on how you look at it. This means that we are buying an end-terrace plot (215 sqm (2315 sq ft)) in a new development area in the Rhein-Neckar district and will be building on it ourselves – but in coordination with our two terrace neighbors.
The municipality, which sold the plots through a local resident model, ideally wanted applicants to apply as a complete housing group with several families and then build accordingly with a general contractor, construction manager, or architect. Of course, that didn’t really work out, so now there are only individual applicants and also homeowners.
After we were awarded the plot, the addresses of the other terrace neighbors were shared to discuss certain matters, such as roof style, whether or not to have a basement, etc. It was immediately clear that everyone preferred to do their own thing. However, we were still able to agree that the housing group will have a gable roof with a pitch of 35 to 40 degrees (within this 5-degree range).
As the end house, we will build without a basement, while the middle house and the other end house will have basements. This obviously presents a challenge as we would have to make a deep foundation or simply skip it, and the middle house would have to support us, as we will start construction first. The current agreement with the middle house is that we will build a deeper foundation at his expense, as supporting our house later on would be considerably more expensive for him.
We are currently close to signing with the construction manager, the notarization appointment for the plot is at the end of June, and we hope to start construction in the fall of this year. Meanwhile, several other freely planned housing groups are being built around us, which might get in the way with their cranes.
I will document the progress here from time to time – such a self-planned terraced house doesn’t come along very often.
P
Pinkiponk14 Aug 2020 08:30kbt09 schrieb:
@Pinkiponk .. @Ybias78 .... please start a new thread. This one is about goalkeepers.You are right. Thank you for the reminder. Sometimes I need a prompt or a nudge.P
Pinkiponk14 Aug 2020 08:34goalkeeper schrieb:
However, they did not allow them to excavate a work area on their terrace for the basement construction...I’m interested in that. Do you know why work areas are not generally set up "at the back or front" of an undeveloped plot, but in your case to the left or right, meaning in a location where there are already houses? Is that due to practical reasons?G
goalkeeper14 Aug 2020 08:49Scout schrieb:
I just noticed now – did the person building the middle house also dump their excavated material on goalkeeper’s property?Exactly – including some parts of the terrace excavated on the side (covered with a tarp on the right).
Why is their measuring frame, that wooden corner structure, positioned so far onto your property? Or is it just an optical illusion caused by the perspective? Your downpipe is also fully exposed and not supported on the sewer pipe, and the dimpled membrane above the insulation seems to be there just for show. I’m afraid you might face quite a few discussions before the original condition is properly restored. Or have you already planned to have the reconstruction supervised from your side?
In any case, I hope your neighbor comes to their senses and that you can live there peacefully in the future.
In any case, I hope your neighbor comes to their senses and that you can live there peacefully in the future.