ᐅ Building an End-Terrace House as a Self-Managed Project with a General Contractor
Created on: 27 May 2019 10:48
G
goalkeeper
Hello everyone,
some of you might have already followed one of my threads about us having to or being allowed to build our end-terrace house on our own responsibility – depending on how you look at it. This means that we are buying an end-terrace plot (215 sqm (2315 sq ft)) in a new development area in the Rhein-Neckar district and will be building on it ourselves – but in coordination with our two terrace neighbors.
The municipality, which sold the plots through a local resident model, ideally wanted applicants to apply as a complete housing group with several families and then build accordingly with a general contractor, construction manager, or architect. Of course, that didn’t really work out, so now there are only individual applicants and also homeowners.
After we were awarded the plot, the addresses of the other terrace neighbors were shared to discuss certain matters, such as roof style, whether or not to have a basement, etc. It was immediately clear that everyone preferred to do their own thing. However, we were still able to agree that the housing group will have a gable roof with a pitch of 35 to 40 degrees (within this 5-degree range).
As the end house, we will build without a basement, while the middle house and the other end house will have basements. This obviously presents a challenge as we would have to make a deep foundation or simply skip it, and the middle house would have to support us, as we will start construction first. The current agreement with the middle house is that we will build a deeper foundation at his expense, as supporting our house later on would be considerably more expensive for him.
We are currently close to signing with the construction manager, the notarization appointment for the plot is at the end of June, and we hope to start construction in the fall of this year. Meanwhile, several other freely planned housing groups are being built around us, which might get in the way with their cranes.
I will document the progress here from time to time – such a self-planned terraced house doesn’t come along very often.
some of you might have already followed one of my threads about us having to or being allowed to build our end-terrace house on our own responsibility – depending on how you look at it. This means that we are buying an end-terrace plot (215 sqm (2315 sq ft)) in a new development area in the Rhein-Neckar district and will be building on it ourselves – but in coordination with our two terrace neighbors.
The municipality, which sold the plots through a local resident model, ideally wanted applicants to apply as a complete housing group with several families and then build accordingly with a general contractor, construction manager, or architect. Of course, that didn’t really work out, so now there are only individual applicants and also homeowners.
After we were awarded the plot, the addresses of the other terrace neighbors were shared to discuss certain matters, such as roof style, whether or not to have a basement, etc. It was immediately clear that everyone preferred to do their own thing. However, we were still able to agree that the housing group will have a gable roof with a pitch of 35 to 40 degrees (within this 5-degree range).
As the end house, we will build without a basement, while the middle house and the other end house will have basements. This obviously presents a challenge as we would have to make a deep foundation or simply skip it, and the middle house would have to support us, as we will start construction first. The current agreement with the middle house is that we will build a deeper foundation at his expense, as supporting our house later on would be considerably more expensive for him.
We are currently close to signing with the construction manager, the notarization appointment for the plot is at the end of June, and we hope to start construction in the fall of this year. Meanwhile, several other freely planned housing groups are being built around us, which might get in the way with their cranes.
I will document the progress here from time to time – such a self-planned terraced house doesn’t come along very often.
goalkeeper schrieb:
Unfortunately, I have to report that our self-installed flooring flexes or gives way in many areas. According to the general contractor, our screed was within tolerance – so we simply installed a vapor retarder and floated the design floor on top. Unfortunately, in some spots it doesn’t feel good to walk on and it’s quite frustrating.
Has anyone else experienced this problem and had the floor reinstalled shortly after moving in?
I will talk to our general contractor to see what he thinks of his “recommendation” in hindsight. He insisted that the flooring could be installed directly.Wishing you strength with the further process.By the way, how is your floor holding up? We heard something similar from some friends. I should also ask them how they solved it.
G
goalkeeper3 Sep 2020 21:19guckuck2 schrieb:
Was there any form of exchange of opinions? What positions are being discussed? There is no exchange of opinions or anything similar. Only the lawyers are communicating now.
We will now make proposals regarding the conditions under which we might still agree to underpinning on our part. We never said that we would not agree. These demands are just being renewed.
OWLer schrieb:
How is your floor doing? Friends of ours reported something similar. I should also ask them how they solved it. The floor has not improved. We may have to address it again at some point.
G
goalkeeper3 Sep 2020 22:41Muc1985 schrieb:
I really hope that such a "clown" doesn't cause you any more trouble.From now on, we’re fighting back...
G
goalkeeper9 Sep 2020 10:10