Hello everyone.
While browsing the website of the municipality where we plan to buy our plot, I came across a document containing a soil report.
Unfortunately, I have no idea what it means...
I only noticed that a borehole (B3!) is located right next to our property.
Could someone please take a look at the report and share their thoughts?
I have attached a screenshot of the file. I’m also including the full PDF in case anyone wants to study it in detail.

While browsing the website of the municipality where we plan to buy our plot, I came across a document containing a soil report.
Unfortunately, I have no idea what it means...
I only noticed that a borehole (B3!) is located right next to our property.
Could someone please take a look at the report and share their thoughts?
I have attached a screenshot of the file. I’m also including the full PDF in case anyone wants to study it in detail.
Have you read the PDF as well? You can skim over the technical jargon, but the conclusion is that you have a very impermeable soil with a high groundwater level, so infiltration is hardly possible.
That’s not necessarily a problem in itself, but I wouldn’t build a basement there. I’m generally not a fan of basements, and this one would require a waterproof concrete shell (a “white tank” structure).
That adds a significant extra cost.
And you would need to keep pumping out water from the excavation throughout the entire construction period...
It’s a pity that the borehole profiles only went down to 1.5 meters (5 feet). I suspect you will need soil replacement or at least soil compaction even without a basement, because building on clay is not ideal either.
That’s not necessarily a problem in itself, but I wouldn’t build a basement there. I’m generally not a fan of basements, and this one would require a waterproof concrete shell (a “white tank” structure).
That adds a significant extra cost.
And you would need to keep pumping out water from the excavation throughout the entire construction period...
It’s a pity that the borehole profiles only went down to 1.5 meters (5 feet). I suspect you will need soil replacement or at least soil compaction even without a basement, because building on clay is not ideal either.
Similar topics