Hello everyone,
we will be building deep inland and still need to cover about 25m (80 feet) through the garden to reach the construction site. I want to properly pave these 25m only after the construction work is finished because I’m afraid the heavy construction machinery will damage the new paving.
How can I reinforce the garden cost-effectively so that the excavator and truck (I am building a timber frame without a basement – so only excavation for the slab) don’t sink into the ground, without spending a fortune?
Regards,
Bodo
we will be building deep inland and still need to cover about 25m (80 feet) through the garden to reach the construction site. I want to properly pave these 25m only after the construction work is finished because I’m afraid the heavy construction machinery will damage the new paving.
How can I reinforce the garden cost-effectively so that the excavator and truck (I am building a timber frame without a basement – so only excavation for the slab) don’t sink into the ground, without spending a fortune?
Regards,
Bodo