ᐅ Building an End-Terrace House as a Self-Managed Project with a General Contractor

Created on: 27 May 2019 10:48
G
goalkeeper
Hello everyone,

some of you might have already followed one of my threads about us having to or being allowed to build our end-terrace house on our own responsibility – depending on how you look at it. This means that we are buying an end-terrace plot (215 sqm (2315 sq ft)) in a new development area in the Rhein-Neckar district and will be building on it ourselves – but in coordination with our two terrace neighbors.

The municipality, which sold the plots through a local resident model, ideally wanted applicants to apply as a complete housing group with several families and then build accordingly with a general contractor, construction manager, or architect. Of course, that didn’t really work out, so now there are only individual applicants and also homeowners.

After we were awarded the plot, the addresses of the other terrace neighbors were shared to discuss certain matters, such as roof style, whether or not to have a basement, etc. It was immediately clear that everyone preferred to do their own thing. However, we were still able to agree that the housing group will have a gable roof with a pitch of 35 to 40 degrees (within this 5-degree range).

As the end house, we will build without a basement, while the middle house and the other end house will have basements. This obviously presents a challenge as we would have to make a deep foundation or simply skip it, and the middle house would have to support us, as we will start construction first. The current agreement with the middle house is that we will build a deeper foundation at his expense, as supporting our house later on would be considerably more expensive for him.

We are currently close to signing with the construction manager, the notarization appointment for the plot is at the end of June, and we hope to start construction in the fall of this year. Meanwhile, several other freely planned housing groups are being built around us, which might get in the way with their cranes.

I will document the progress here from time to time – such a self-planned terraced house doesn’t come along very often.
K
kbt09
18 Nov 2019 08:03
2 middle houses?
G
goalkeeper
18 Nov 2019 08:35
kbt09 schrieb:

2 middle units?

This is a block of four units.
K
kbt09
18 Nov 2019 10:55
Really, is there supposed to be a house on the left side?
G
goalkeeper
18 Nov 2019 11:23
kbt09 schrieb:

Really, a house is supposed to go on the left as well?

Of course – 180 sqm (1,937 sq ft) plot.
S
Scout
18 Nov 2019 11:25
To the left of the portable toilet? Then the side windows would be right next to the street, without a sidewalk and verge?
G
goalkeeper
18 Nov 2019 11:35
Scout schrieb:

Left of the portable toilet? Are the side windows then directly facing the street, without a sidewalk or curb?

There are no sidewalks or curbs in the development area. The paved surface ends directly at the property boundaries.

Exactly – to the left of the portable toilet is the small corner plot, which also has to be set back 5m (16 ft) due to the parking space requirement, as it is too narrow for side parking spaces.