ᐅ Wall waterproofing not compliant with standards, minor defect
Created on: 20 Apr 2021 07:57
M
Meyer37Hello,
we are currently building a single-family house in Baden-Württemberg with a general contractor, and the shell structure has just been completed.
During the inspection with our expert, it was noticed that the masonry waterproofing was not carried out fully in compliance with the standards.
It should have been implemented as shown in the top image; unfortunately, the yellow-marked area is missing. The membrane has not been wrapped around the strip foundation but is only laid horizontally.
I have not yet spoken with the general contractor because I am still unsure about how to proceed.
What options do I have? Which ones are reasonable and proportionate?
Is this something where I should demand a defect repair? Or can it be overlooked if everything else is correct? How critical is the missing part?
So far, I am satisfied with the contractor and somewhat hesitant/afraid to disturb the good relationship.
we are currently building a single-family house in Baden-Württemberg with a general contractor, and the shell structure has just been completed.
During the inspection with our expert, it was noticed that the masonry waterproofing was not carried out fully in compliance with the standards.
It should have been implemented as shown in the top image; unfortunately, the yellow-marked area is missing. The membrane has not been wrapped around the strip foundation but is only laid horizontally.
I have not yet spoken with the general contractor because I am still unsure about how to proceed.
What options do I have? Which ones are reasonable and proportionate?
Is this something where I should demand a defect repair? Or can it be overlooked if everything else is correct? How critical is the missing part?
So far, I am satisfied with the contractor and somewhat hesitant/afraid to disturb the good relationship.
Meyer37 schrieb:
Which ones are reasonable and proportionate? Meyer37 schrieb:
Is this something for which I should request a defect remediation? Meyer37 schrieb:
How critical is the absence? Your questions should be answered by the expert...
Meyer37 schrieb:
During the inspection with our expert ... or what did he say?
M
Myrna_Loy20 Apr 2021 09:42In our case, it was not installed immediately either. The reason given was that it could easily be damaged during the initial further construction work.