ᐅ Drain pipe should not be installed beneath the screed (cement floor layer).

Created on: 14 Jul 2019 17:14
M
M4rvin
Hi!
Shouldn't the drain pipe (kitchen) actually be located under the screed? This metal clamp also protrudes quite a bit! How am I supposed to install my tiles properly with this?

Offene farbige Rohrleitungen in einer Wandöffnung (rot, grün, blau) mit blauer Leitung.


Rotes isoliertes Rohr neben grünen Rohren an einer Bauwand; blauer Bodenabschluss auf grobem Beton.


Hand hält blauen Schlauch gegen rotes Rohr; Metallschelle verbindet Rohre an rauer Wand.
Z
Zaba12
22 Jul 2019 14:53
M4rvin schrieb:

Yes, we will tile everything ourselves except the bathrooms.
So, does “nice screed” mean the tiler’s work?
Or is there a standard that it has to be clean and level?

Of course, we will prime it with a deep primer, for example.

This can be done by either the screed installer or the tiler. Our tiler even lent us the floor grinder free of charge!
H
HilfeHilfe
22 Jul 2019 17:09
So much for do-it-yourself!