Hello,
I met with the electrician today regarding the application for the electricity network connection and temporary construction power. He suggested two options. Which one is better?
Option 1:
Install a connection pillar on the property, then connect the temporary construction power distribution box to it, and later run the connection from there to the house. Apparently, I would not pay a temporary construction power tariff, but a regular electricity tariff instead, and I would not need a main distribution board, only a distribution box.
Option 2:
Have temporary construction power installed, then remove everything afterwards and run cables into the house to the main distribution board.
Thank you in advance.
There is enough space, and the pillar would not bother me.
I met with the electrician today regarding the application for the electricity network connection and temporary construction power. He suggested two options. Which one is better?
Option 1:
Install a connection pillar on the property, then connect the temporary construction power distribution box to it, and later run the connection from there to the house. Apparently, I would not pay a temporary construction power tariff, but a regular electricity tariff instead, and I would not need a main distribution board, only a distribution box.
Option 2:
Have temporary construction power installed, then remove everything afterwards and run cables into the house to the main distribution board.
Thank you in advance.
There is enough space, and the pillar would not bother me.
P
pffreestyler27 May 2019 09:59Check the individual costs first. For us, E.On is the main energy supplier, and having the connection on our own property would have been several hundred euros more expensive. If the price were the same, I would always prefer that option for practical reasons.
Similar topics