ᐅ New Single-Family Home Construction in Southern Germany
Created on: 18 Nov 2020 00:43
W
WilderSueden
Hello everyone,
after jumping straight into the basement discussion thread, I want to use this one as an introduction and idea-sharing thread. Some things might seem a bit chaotic at first, but that will surely clear up.
We are expecting our first child in February. Since two rooms are obviously too few for the long term, we need something larger. The housing market here in Konstanz is notoriously difficult, so we didn’t spend much time searching here. Thanks to Corona home office, we focused on areas a bit further away right from the start. Initially, we looked mostly at existing properties, but due to the poor condition of what’s on offer, we unexpectedly ended up deciding to build. We were actually lucky to get a plot in a new development area around Stockach-Pfullendorf. The site started being developed this week and will probably be buildable from summer onward.
Here are some key details:
- He/I am 33, work in the software industry, based in Konstanz, from a rural area
- She is 41, a teacher in the Hegau region, from a city that basically doesn’t exist
- One child on the way, no further children planned and unlikely due to her age
- Currently living in about 65sqm (700 sq ft) with 2.5 rooms in a lovely apartment building…
- Basically, we don’t want anything too fancy—no extensive smart home automation, no luxury mansion with marble and so on. Just something solid and nice. We are not building to fulfill a lifelong dream but to avoid renovating an old house worth half a million euros. Plain wallpaper texture and laminate flooring would be fine for us if the quality is good.
- Accordingly, we don’t mind using a “standard” floor plan from a prefabricated house builder or a typical model home.
- That said, since we are building, it should be energy efficient and we don’t want to use concepts that might soon be politically outdated or unsupported.
- Do-it-yourself work only to a limited extent, as we are neither professionals nor do we have relevant contacts. Also, the new house is a bit further away, so working on it in the evening is unlikely. A weekend of painting before moving in is no problem, and after moving in, doing the carport, terrace, and garden ourselves is also fine.
- The construction partner must be reliable.
Plot and financials:
- Plot roughly 700sqm (7,535 sq ft) at 98€ per sqm → 70,000€, fairly rectangular
- 120,000€ equity (with some reserve left)
- Financing and ownership entirely in my name (unmarried and no joint assets intended)
- Planned overall budget about 500,000€
- Target monthly payment 1,500€
- Accordingly, loan to be repaid in 25 years with that rate, with some extra repayments planned mid-term aiming for about 20 years total
Budget breakdown:
- Plot 70,000€
- Ancillary plot costs 5,000€
- Other construction-related fees 60,000€
- Basement 50,000€
- Kitchen 10,000€
- Driveway, carport, terrace as DIY 15,000€
-----
210,000€
Leaves about 290,000€ in the budget for the house itself, which is probably quite tight for what we have planned. The budget still needs to be adjusted with a buffer.
So far, our wishlist looks roughly like this:
- Not excessively large, more like 120–130sqm (1,290–1,400 sq ft)
- Efficient, modern house
- Photovoltaic system (possibly with battery storage)
- Underfloor heating with heat pump
- Home office for me on the ground floor (makes sense since I mostly work from home)
- Bedroom upstairs, one office for her that also serves as a guest room and reserve nursery
- Large open-plan kitchen/living area
- Basement
- Cistern
- Carport for two cars and one trailer
Our first contact about building was through an ad from the local Town & Country partner. The consultant was friendly, and the show house in Geisingen looked quite nice, but somehow it all felt a bit too conservative. Built according to the Energy Saving Ordinance 2016, standard gas heating. Sure, upgrades are possible, but I’m not sure if a heat pump makes sense under that regulation anymore. The fact that the show house had cracks in the plaster here and there isn’t exactly reassuring either. But the base price is lower. Current status: two meetings, visited the show house, haven’t requested the scope of services yet.
Then we looked a bit into prefab houses. Most offer KfW55 standard, which is closer to what we want and would be a good base for going to KfW40+ since a photovoltaic system is already planned (probably just with battery preparation though). Visited the park in Villingen-Schwenningen. Had a long chat with Schwabenhaus; the consultant seemed to want to downplay costs and was very keen to sell a ground-source heat pump with boreholes. The upgrade options for the promotional houses looked likely to increase costs significantly. Visited Heldhaus, liked it quite a lot but their cost outline overshoots the budget by roughly 100,000€.
Today we had an appointment with Schwörerhaus. The floor plan of one of their promotional houses fits pretty well. Basement plus KfW40+ seems somewhat challenging in combination. Otherwise, a generally good impression; the briefly reviewed scope of services doesn’t give the impression the house would be unpleasant to live in. Let’s see what the first offer will look like. I don’t get the feeling there’s much that could go wrong there.
Next week we have an appointment with Weberhaus. We found a floor plan we really like. The price is initially the highest, but their examples include KfW40+ standard and smart home automation upfront.
Our goal is to narrow down the number of companies we continue with to a maximum of two by Christmas and then decide on a construction partner early next year. In spring, the baby will take priority, not just house planning.
I’ve already posted some thoughts about the basement and possible basement substitutes. The insulation costs for the basement seem to fully consume the additional subsidies, so the photovoltaic battery would have to be paid out of pocket again. One idea on the drive back from the appointment was whether it makes sense to build the house initially to KfW55 standard without extra insulation. The difference in heating costs is relatively small. Then install just the conduit pipes for photovoltaics with battery preparation. A few years later, add a battery once prices drop. That would also likely bring the house closer to the planned budget than going for KfW40+.
These are my thoughts so far. Have I missed anything important?
after jumping straight into the basement discussion thread, I want to use this one as an introduction and idea-sharing thread. Some things might seem a bit chaotic at first, but that will surely clear up.
We are expecting our first child in February. Since two rooms are obviously too few for the long term, we need something larger. The housing market here in Konstanz is notoriously difficult, so we didn’t spend much time searching here. Thanks to Corona home office, we focused on areas a bit further away right from the start. Initially, we looked mostly at existing properties, but due to the poor condition of what’s on offer, we unexpectedly ended up deciding to build. We were actually lucky to get a plot in a new development area around Stockach-Pfullendorf. The site started being developed this week and will probably be buildable from summer onward.
Here are some key details:
- He/I am 33, work in the software industry, based in Konstanz, from a rural area
- She is 41, a teacher in the Hegau region, from a city that basically doesn’t exist
- One child on the way, no further children planned and unlikely due to her age
- Currently living in about 65sqm (700 sq ft) with 2.5 rooms in a lovely apartment building…
- Basically, we don’t want anything too fancy—no extensive smart home automation, no luxury mansion with marble and so on. Just something solid and nice. We are not building to fulfill a lifelong dream but to avoid renovating an old house worth half a million euros. Plain wallpaper texture and laminate flooring would be fine for us if the quality is good.
- Accordingly, we don’t mind using a “standard” floor plan from a prefabricated house builder or a typical model home.
- That said, since we are building, it should be energy efficient and we don’t want to use concepts that might soon be politically outdated or unsupported.
- Do-it-yourself work only to a limited extent, as we are neither professionals nor do we have relevant contacts. Also, the new house is a bit further away, so working on it in the evening is unlikely. A weekend of painting before moving in is no problem, and after moving in, doing the carport, terrace, and garden ourselves is also fine.
- The construction partner must be reliable.
Plot and financials:
- Plot roughly 700sqm (7,535 sq ft) at 98€ per sqm → 70,000€, fairly rectangular
- 120,000€ equity (with some reserve left)
- Financing and ownership entirely in my name (unmarried and no joint assets intended)
- Planned overall budget about 500,000€
- Target monthly payment 1,500€
- Accordingly, loan to be repaid in 25 years with that rate, with some extra repayments planned mid-term aiming for about 20 years total
Budget breakdown:
- Plot 70,000€
- Ancillary plot costs 5,000€
- Other construction-related fees 60,000€
- Basement 50,000€
- Kitchen 10,000€
- Driveway, carport, terrace as DIY 15,000€
-----
210,000€
Leaves about 290,000€ in the budget for the house itself, which is probably quite tight for what we have planned. The budget still needs to be adjusted with a buffer.
So far, our wishlist looks roughly like this:
- Not excessively large, more like 120–130sqm (1,290–1,400 sq ft)
- Efficient, modern house
- Photovoltaic system (possibly with battery storage)
- Underfloor heating with heat pump
- Home office for me on the ground floor (makes sense since I mostly work from home)
- Bedroom upstairs, one office for her that also serves as a guest room and reserve nursery
- Large open-plan kitchen/living area
- Basement
- Cistern
- Carport for two cars and one trailer
Our first contact about building was through an ad from the local Town & Country partner. The consultant was friendly, and the show house in Geisingen looked quite nice, but somehow it all felt a bit too conservative. Built according to the Energy Saving Ordinance 2016, standard gas heating. Sure, upgrades are possible, but I’m not sure if a heat pump makes sense under that regulation anymore. The fact that the show house had cracks in the plaster here and there isn’t exactly reassuring either. But the base price is lower. Current status: two meetings, visited the show house, haven’t requested the scope of services yet.
Then we looked a bit into prefab houses. Most offer KfW55 standard, which is closer to what we want and would be a good base for going to KfW40+ since a photovoltaic system is already planned (probably just with battery preparation though). Visited the park in Villingen-Schwenningen. Had a long chat with Schwabenhaus; the consultant seemed to want to downplay costs and was very keen to sell a ground-source heat pump with boreholes. The upgrade options for the promotional houses looked likely to increase costs significantly. Visited Heldhaus, liked it quite a lot but their cost outline overshoots the budget by roughly 100,000€.
Today we had an appointment with Schwörerhaus. The floor plan of one of their promotional houses fits pretty well. Basement plus KfW40+ seems somewhat challenging in combination. Otherwise, a generally good impression; the briefly reviewed scope of services doesn’t give the impression the house would be unpleasant to live in. Let’s see what the first offer will look like. I don’t get the feeling there’s much that could go wrong there.
Next week we have an appointment with Weberhaus. We found a floor plan we really like. The price is initially the highest, but their examples include KfW40+ standard and smart home automation upfront.
Our goal is to narrow down the number of companies we continue with to a maximum of two by Christmas and then decide on a construction partner early next year. In spring, the baby will take priority, not just house planning.
I’ve already posted some thoughts about the basement and possible basement substitutes. The insulation costs for the basement seem to fully consume the additional subsidies, so the photovoltaic battery would have to be paid out of pocket again. One idea on the drive back from the appointment was whether it makes sense to build the house initially to KfW55 standard without extra insulation. The difference in heating costs is relatively small. Then install just the conduit pipes for photovoltaics with battery preparation. A few years later, add a battery once prices drop. That would also likely bring the house closer to the planned budget than going for KfW40+.
These are my thoughts so far. Have I missed anything important?
W
WilderSueden27 Dec 2020 19:14Hausbau0815 schrieb:
Doesn't the arsenic have to be removed anyway, whether there is a basement or not? I would rather not, or preferably not, have my house built on arsenic-contaminated soil. Basically, it is not dangerous* as long as you don’t transport it somewhere else and mix it with uncontaminated soil. So, it can’t be used as a noise barrier for the new highway but has to be taken to a landfill. Otherwise, according to the soil report I was able to review, the ground is stable enough to manage with minimal soil replacement. Assuming an 80cm (31 inches) excavation, we would have about 80 cubic meters of soil to deal with, which we can spread over the rest of the property quite well (calculation based on 400 square meters distribution area → average 20cm (8 inches)), especially since the terrain gently slopes downward to the west anyway. If we had to replace 2 meters (6.5 feet) of soil, the situation would be completely different; we wouldn’t be able to redistribute it on site, and then the basement would be unavoidable. These considerations regarding soil replacement are also why I asked the local authority for a soil report, which then revealed the arsenic issue.
*From everything I have found, it is sufficient to wash root vegetables thoroughly before consuming them, so they can be eaten safely. For strawberries and similar fruits, it is sometimes recommended to use straw mulch to prevent direct contact with the soil. Otherwise, it is possible to live on arsenic-contaminated soil without having to replace the entire property.
I am wondering why basements are often omitted nowadays. Of course, cost is a factor, but has the increase in prices basically forced people to build without a basement, or do most home builders simply prefer not to have one anymore? And if the majority no longer want a basement, could that have contributed to the price increases? After all, home builders have more money available. It's similar to the correlation between low (construction) interest rates and property prices – "cheap money = more money for building or buying a house."
W
WilderSueden27 Dec 2020 19:19haydee schrieb:
Where do you plan to collect dirty laundry? In the bin that is currently placed in the bathroom right next to the washing machine. It holds about one full load; with a child, we will probably need a second bin as well.
haydee schrieb:
Where do you want to soak stains? In the sink? Or why do all designers include double sinks in the bathroom?
haydee schrieb:
Where will cleaning supplies for the upper floor be stored? By cleaning supplies, do you mean just things like glass cleaner, descaler, and toilet cleaner, or are you planning to get a separate vacuum cleaner and mop bucket for the upper floor as well? The first can fit in a cabinet compartment.
pagoni2020 schrieb:
..... basements used to be standard, attics, party rooms, etc., but "times are a changin’." Today, 70-year-olds build tiny houses or live in shared senior living arrangements, or they travel for three years in a motorhome.I am still a confirmed basement fan, but of course there are other opinions, as mentioned above, that basements are "out" and considered a leftover from the post-war era for washtubs, meat jelly, and grandma’s preserves.
WilderSueden schrieb:
In the sink? Or why do all designers put double sinks in the bathroom?So two people can brush their teeth at the same time without getting in each other’s way while washing up. 😀