smallwood26 Aug 2020 23:03Today I received an offer for the structural engineering planning for my construction project of a 130m² (1,400 sq ft) single-family house without a basement, with a shed roof, 1.5 stories, detached.
Unfortunately, I am unable to assess the offer and would appreciate expert advice. These are rounded net prices:
Service phase 1 – Basic evaluation €300
Service phase 2 – Preliminary design €1,000
Service phase 3 – Design planning €1,500
Service phase 4 – Building permit / planning permission €3,000
Service phase 5 – Detailed design €4,000
Service phase 6 – Preparation for tendering €200
Total net cost €10,000.
Thank you in advance.
Unfortunately, I am unable to assess the offer and would appreciate expert advice. These are rounded net prices:
Service phase 1 – Basic evaluation €300
Service phase 2 – Preliminary design €1,000
Service phase 3 – Design planning €1,500
Service phase 4 – Building permit / planning permission €3,000
Service phase 5 – Detailed design €4,000
Service phase 6 – Preparation for tendering €200
Total net cost €10,000.
Thank you in advance.
I am not familiar with the federal state. However, the HOAI applies everywhere. I just ran it through my software. Conclusion: Very fair!!! There is nothing more to add here.
S
smallwood26 Aug 2020 23:34That sounds promising. Thank you.
The construction will take place in Baden-Württemberg.
The construction will take place in Baden-Württemberg.
O
Osnabruecker27 Aug 2020 06:44Phase 6 does not fit within the budget range of the other phases. Has it been significantly scaled down?
I agree.
According to the HOAI fee structure, it’s usually about double, but $10,000 is more than enough to make a profit.
You can also find someone who will do it for half that, if you want.
Yes, it’s about 1–2 hours of work.
According to the HOAI fee structure, it’s usually about double, but $10,000 is more than enough to make a profit.
You can also find someone who will do it for half that, if you want.
Osnabruecker schrieb:
Phase 6 does not fit into the price range of the other phases.
Has it been significantly scaled down?
Yes, it’s about 1–2 hours of work.