the screed has been in place for 1.5 weeks. If nothing changes, the heat pump is scheduled to be installed in week 15. Tiles should be installed under the heat pump as well. My site manager mentioned that you could lay tiles there using a vapor-permeable adhesive. What do you think?
And if so, should the tiling be done only in the area of the heat pump or also in the utility room and the adjacent storage room?
Thanks!
By the way, what tile sizes do you usually use in the utility room? Maybe some pictures as well?
the screed has been in place for 1.5 weeks. If nothing changes, the heat pump is scheduled to be installed in week 15. Tiles should be installed under the heat pump as well. My site manager mentioned that you could lay tiles there using a vapor-permeable adhesive. What do you think?
And if so, should the tiling be done only in the area of the heat pump or also in the utility room and the adjacent storage room?
Thanks!
By the way, what tile sizes do you usually use in the utility room? Maybe some pictures as well?
Domski schrieb:
Use an S2 adhesive, which is basically approved for use once cured (usually indicated from day 3 after screed installation in the datasheet), and initially apply it only to the absolutely necessary area. Is it cement screed?Yes, it is cement screed.Similar topics