Hello dear community,
We are planning to build a house by the end of the year, and the contract specifies that the walls will be handed over in Q2. Since I am working on the cost calculation, I need your opinion/experience on what should be included.
Requirements:
The walls should be simply painted, nothing special—just clean and neat. Or, if someone knows the additional cost, possibly painter’s fleece (paintable wall fleece).
The question is: which Q-level do I need for this?
Flooring:
Vinyl in the upper floor, parquet in the living/dining area.
Utility room, bathroom, and hallway are already tiled.
A floor plan is attached for a clearer idea. The house will have 140m² (1507 sq ft) and will be built solidly (masonry construction).
Thanks a lot for your help!

We are planning to build a house by the end of the year, and the contract specifies that the walls will be handed over in Q2. Since I am working on the cost calculation, I need your opinion/experience on what should be included.
Requirements:
The walls should be simply painted, nothing special—just clean and neat. Or, if someone knows the additional cost, possibly painter’s fleece (paintable wall fleece).
The question is: which Q-level do I need for this?
Flooring:
Vinyl in the upper floor, parquet in the living/dining area.
Utility room, bathroom, and hallway are already tiled.
A floor plan is attached for a clearer idea. The house will have 140m² (1507 sq ft) and will be built solidly (masonry construction).
Thanks a lot for your help!
Ysop*** schrieb:
And part of it is already tiled? Or do you only have the materials so far?The house will be delivered with the bathroom, utility room, and hallway tiled.