ᐅ When did you move into your newly built home (fully completed)?

Created on: 4 Jun 2020 19:42
K
kati1337
We have received the construction schedule from the general contractor and now know when the handover with the blower door test is planned. However, the letter mentioned that the new build will still be damp at handover, and special attention must be paid to the moisture levels before installing the kitchen.

Now we are wondering what we should factor in. We are building over the summer, with completion planned for September. How long should we wait before having the kitchen installed? And how long did you wait, or would you recommend waiting, before moving in?

We want to avoid mold risks but also don’t want to pay rent unnecessarily for too long.
tomtom795 Jun 2020 19:26
Controlled residential ventilation helps to remove moisture.
kati13377 Jun 2020 22:18
tomtom79 schrieb:

Controlled residential ventilation helps to remove moisture.

We have a central ventilation system—is that something like this?
KingJulien7 Jun 2020 23:12
kati1337 schrieb:

We have a central ventilation system; is it something like that?
= Controlled residential ventilation -> Yes.