Hello everyone,
We are currently facing some issues with our installation. The plumbing company wants to install the proposed mechanical ventilation system with heat recovery in front of our meter cabinet, which would reduce the required 120cm (47 inches) of working clearance in front of the meter cabinet to only 95cm (37 inches). To avoid any risks, we want to fully comply with this regulation. This is now causing a minor space problem. It could be resolved if we don’t place the buffer tank directly next to the geothermal heat pump but instead move the heat pump out of the small technical room and install it in the utility room. The distance would then be about 4 meters (13 feet), or slightly less.
Is this possible?
Why am I asking here? Because we will be meeting with the tradespeople in the next few days, and I want to be prepared by then.
Many thanks for all your answers.
Best regards
We are currently facing some issues with our installation. The plumbing company wants to install the proposed mechanical ventilation system with heat recovery in front of our meter cabinet, which would reduce the required 120cm (47 inches) of working clearance in front of the meter cabinet to only 95cm (37 inches). To avoid any risks, we want to fully comply with this regulation. This is now causing a minor space problem. It could be resolved if we don’t place the buffer tank directly next to the geothermal heat pump but instead move the heat pump out of the small technical room and install it in the utility room. The distance would then be about 4 meters (13 feet), or slightly less.
Is this possible?
Why am I asking here? Because we will be meeting with the tradespeople in the next few days, and I want to be prepared by then.
Many thanks for all your answers.
Best regards
N
nordanneyX8 Jun 2022 22:56lars909 schrieb:
Are there geothermal heat pumps with a 300-liter (79-gallon) storage tank?Storage tank separate. Naturally, not as a combined unit.Similar topics