Hello,
I am interested in a plot of land located in the second row. The plot will be divided and registered in the land register, and an access road will be constructed.
The house is planned to be built 30m (98 feet) from the beginning of the plot. Has anyone built on a second-row plot, and what kind of costs should I expect for site development, considering the distance of 30m (98 feet)?
Thank you
I am interested in a plot of land located in the second row. The plot will be divided and registered in the land register, and an access road will be constructed.
The house is planned to be built 30m (98 feet) from the beginning of the plot. Has anyone built on a second-row plot, and what kind of costs should I expect for site development, considering the distance of 30m (98 feet)?
Thank you
Grillhendl schrieb:
Were these the costs you had to pay to the municipality, or to the civil engineering contractor you hired?
I have a similar “issue,” which I already discussed in a previous post here.
https://www.hausbau-forum.de/threads/grundstueckserschliessung-nachtraeglich-wann-rechnungsstellung.35819/ I would need to check the details again.
But it should have all been for the civil engineering contractor.