Hello everyone,
We are building a house in Brandenburg and have now received the cost estimate from the local utility provider. However, I find the prices somewhat high. Could you please take a look:
The house connection is calculated as follows (edis):
Network connection from the house connection pillar up to 100 A = 1023.27 euros
Commissioning of the network connection = 108.40 euros
Additional length 32 meters (105 feet) = 817.28 euros
Total gross: 2319.25 euros
Then there is construction power calculated for 60 days = 550 euros
Additionally, we are supposed to pay separately for the connection from the house connection pillar into the house. Costs for this are not yet known.
I find these prices extremely excessive.
A brief note about the house:
The house is about 45 meters (148 feet) away from the property boundary.
We are building a simple one-and-a-half-story house with an air source heat pump.
I would appreciate any feedback.
We are building a house in Brandenburg and have now received the cost estimate from the local utility provider. However, I find the prices somewhat high. Could you please take a look:
The house connection is calculated as follows (edis):
Network connection from the house connection pillar up to 100 A = 1023.27 euros
Commissioning of the network connection = 108.40 euros
Additional length 32 meters (105 feet) = 817.28 euros
Total gross: 2319.25 euros
Then there is construction power calculated for 60 days = 550 euros
Additionally, we are supposed to pay separately for the connection from the house connection pillar into the house. Costs for this are not yet known.
I find these prices extremely excessive.
A brief note about the house:
The house is about 45 meters (148 feet) away from the property boundary.
We are building a simple one-and-a-half-story house with an air source heat pump.
I would appreciate any feedback.
M
meister keks2 Jul 2017 23:13I don’t find the prices unreasonable now either.
T
toxicmolotof3 Jul 2017 00:02Wastewater will probably become more expensive than electricity. And cables and telephone connections will also add to the costs.
Your "problem" isn’t the connection fee but the 45 meters (150 feet).
Just by the way... why have a house connection pillar at all? In our area, such things are usually completely omitted.
Your "problem" isn’t the connection fee but the 45 meters (150 feet).
Just by the way... why have a house connection pillar at all? In our area, such things are usually completely omitted.