Hello everyone,
We are building a house in Brandenburg and have now received the cost estimate from the local utility provider. However, I find the prices somewhat high. Could you please take a look:
The house connection is calculated as follows (edis):
Network connection from the house connection pillar up to 100 A = 1023.27 euros
Commissioning of the network connection = 108.40 euros
Additional length 32 meters (105 feet) = 817.28 euros
Total gross: 2319.25 euros
Then there is construction power calculated for 60 days = 550 euros
Additionally, we are supposed to pay separately for the connection from the house connection pillar into the house. Costs for this are not yet known.
I find these prices extremely excessive.
A brief note about the house:
The house is about 45 meters (148 feet) away from the property boundary.
We are building a simple one-and-a-half-story house with an air source heat pump.
I would appreciate any feedback.
We are building a house in Brandenburg and have now received the cost estimate from the local utility provider. However, I find the prices somewhat high. Could you please take a look:
The house connection is calculated as follows (edis):
Network connection from the house connection pillar up to 100 A = 1023.27 euros
Commissioning of the network connection = 108.40 euros
Additional length 32 meters (105 feet) = 817.28 euros
Total gross: 2319.25 euros
Then there is construction power calculated for 60 days = 550 euros
Additionally, we are supposed to pay separately for the connection from the house connection pillar into the house. Costs for this are not yet known.
I find these prices extremely excessive.
A brief note about the house:
The house is about 45 meters (148 feet) away from the property boundary.
We are building a simple one-and-a-half-story house with an air source heat pump.
I would appreciate any feedback.