ᐅ Process of Building a Prefabricated House Including Land Brokerage

Created on: 3 Mar 2020 11:13
C
CaptainBaubär
Hello everyone,

We are considering building a house while searching for a property to own. Unfortunately, there is a shortage of available land in the Mainz area. A well-known prefab house company (Bien-Zenker) offered us an interesting plot through a sales representative. As often seems to be the case, we would first have to sign a construction contract before being shown the property. Although there is a cancellation clause stating that if no plot is found within one year, the contract can be terminated, a specialist lawyer advised that this clause is too vague and that we should not sign.

I also don’t like this order of steps. We have already met with the representative and discussed our general ideas and budget, but I would prefer to sign the contract only after soil tests and other surveys are completed, so we can better estimate the costs beforehand.

Now to my question:

Is it now "normal" to sign a contract before even knowing what can be built? Has anyone had experience with adjusting the process order to suit their preferences?
Tolentino14 Sep 2020 11:56
@11ant: What was the trick again to prevent links from leading to an "oops, page not found" error?
O
Octrineddy
14 Sep 2020 11:59
Even though I am not being addressed: You have to change a small "t" to a capital "T" in the word "Thread." Or it was the other way around.
@11ant please correct me if necessary.
Tolentino14 Sep 2020 12:04
Octrineddy schrieb:

You have to change a lowercase "t" into an uppercase "T" in the word "Thread".
Just tried it – exactly like that! – oh no, the other way around. Haha

Good luck, good luck, good luck