ᐅ First Pre-Prefabricated House Quote – Are Additional Construction Costs ROUGHLY Realistic?
Created on: 27 Aug 2019 02:20
C
Caro0103mHello and good evening,
we are currently considering building a small single-family house.
Since our budget is quite limited,
we are looking at various construction providers to get some price quotes.
The first offer (including the total cost calculation) has now been presented to us by Heinz von Heiden:
>>> Are the numbers/data/facts roughly realistic? - or are we way off? <<<[/B]
We have emphasized several times that we want realistic values...
Of course, some items (the plot of land is not finalized yet) are only estimates, but maybe you have a bit more experience.
------------------------------------------------------------------------
Construction site is in Baden-Württemberg
Plot size about 350m² (approx. 3,770 sq ft)
Small single-family house with 8.5x9.5m² (approx. 28x31 ft) footprint
House price around €216,000 (including electric shutters, underfloor heating, automatic ventilation system)
------------------------------------------------------------------------
Now, regarding additional construction costs:
- House connections for water/electricity + surveyor + provision of temporary construction power/water €10,000
- Earthworks (sewer/shaft for connections, no basement) / filling of plot (plot not purchased yet) €6,000
Parking space: access path to garage / parking space (simply filling the front area with gravel or stones for now) €3,800
Painting/flooring work (tiles are included in the house price for WC/toilet/hallway/bathroom)
- Laminate flooring (self-installed) for about 90m² (approx. 970 sq ft) + wall finishing (plastering or painting for about 130m² (approx. 1,400 sq ft) as self-performance) €12,000
Outdoor area (access path/entrance step / terrace paving / privacy screen / planting) €11,000
Contingencies = €5,000
Waste/construction debris disposal + building permit fees (planning permission) = €1,000
-->
So the calculation is €216,000 for the house,
€95,000 for the land (which will be difficult, we know)
€65,000 for everything else
Now I hope this roughly makes sense?
Thanks a lot to you all and have a wonderful night, dear friends.
Best regards, Caroline
we are currently considering building a small single-family house.
Since our budget is quite limited,
we are looking at various construction providers to get some price quotes.
The first offer (including the total cost calculation) has now been presented to us by Heinz von Heiden:
>>> Are the numbers/data/facts roughly realistic? - or are we way off? <<<[/B]
We have emphasized several times that we want realistic values...
Of course, some items (the plot of land is not finalized yet) are only estimates, but maybe you have a bit more experience.
------------------------------------------------------------------------
Construction site is in Baden-Württemberg
Plot size about 350m² (approx. 3,770 sq ft)
Small single-family house with 8.5x9.5m² (approx. 28x31 ft) footprint
House price around €216,000 (including electric shutters, underfloor heating, automatic ventilation system)
------------------------------------------------------------------------
Now, regarding additional construction costs:
- House connections for water/electricity + surveyor + provision of temporary construction power/water €10,000
- Earthworks (sewer/shaft for connections, no basement) / filling of plot (plot not purchased yet) €6,000
Parking space: access path to garage / parking space (simply filling the front area with gravel or stones for now) €3,800
Painting/flooring work (tiles are included in the house price for WC/toilet/hallway/bathroom)
- Laminate flooring (self-installed) for about 90m² (approx. 970 sq ft) + wall finishing (plastering or painting for about 130m² (approx. 1,400 sq ft) as self-performance) €12,000
Outdoor area (access path/entrance step / terrace paving / privacy screen / planting) €11,000
Contingencies = €5,000
Waste/construction debris disposal + building permit fees (planning permission) = €1,000
-->
So the calculation is €216,000 for the house,
€95,000 for the land (which will be difficult, we know)
€65,000 for everything else
Now I hope this roughly makes sense?
Thanks a lot to you all and have a wonderful night, dear friends.
Best regards, Caroline
H
HilfeHilfe27 Aug 2019 06:58Hello, at H&H they operate in the low-price segment.
In other words, you should not expect leniency.
In other words, you should not expect leniency.
Where did you get these figures from?
- House connections for water/electricity: 8,000 euros, with gas an additional 3,000 euros
- Surveyor: 3,000 euros, if necessary at all
- Provision of construction power/water: It depends. I estimated 2,000 euros myself. Since I didn’t have to pay meter rent (100 euros/week), it was then 1,000 euros including construction water
- Sewer manhole/connection shaft (for drainage): around 4,000–5,000 euros
- Filling the plot (not easy to estimate) but 6,000 euros could be realistic
- Parking space: access road garage / access road parking space (just filling the entrance area with stones for the start) 3,800 euros.
Painter/flooring work (tiles are included in the house price for WC/toilet/hall/bathroom)
- Laminate (DIY) for about 90m² (970 ft²) + wall covering (plastering or painting for about 130m² (1,400 ft²) as DIY) 12,000 euros
Why does it say plaster? Do you mean interior plaster? Forget it
- Access path/terrace surface: 10,000 euros
- Fence/privacy screen: 3,000 euros
- Landscaping: 2,000 euros
- Unexpected costs = buffer, not really calculable. But 5,000 euros is not a real buffer; that amount was already consumed by the landfill fees in my case
- Landfill = see above. For excavation classes Z0 to Z1.1
- Pushing back soil: 1,500 euros
- Soil analysis / landfill assessment: 1,500–2,000 euros
- Permit fees based on building cost: 2,000 euros, for exempt buildings 100 euros
How much living space do you have in square meters? That’s not clear to me!
- House connections for water/electricity: 8,000 euros, with gas an additional 3,000 euros
- Surveyor: 3,000 euros, if necessary at all
- Provision of construction power/water: It depends. I estimated 2,000 euros myself. Since I didn’t have to pay meter rent (100 euros/week), it was then 1,000 euros including construction water
- Sewer manhole/connection shaft (for drainage): around 4,000–5,000 euros
- Filling the plot (not easy to estimate) but 6,000 euros could be realistic
- Parking space: access road garage / access road parking space (just filling the entrance area with stones for the start) 3,800 euros.
Painter/flooring work (tiles are included in the house price for WC/toilet/hall/bathroom)
- Laminate (DIY) for about 90m² (970 ft²) + wall covering (plastering or painting for about 130m² (1,400 ft²) as DIY) 12,000 euros
Why does it say plaster? Do you mean interior plaster? Forget it
- Access path/terrace surface: 10,000 euros
- Fence/privacy screen: 3,000 euros
- Landscaping: 2,000 euros
- Unexpected costs = buffer, not really calculable. But 5,000 euros is not a real buffer; that amount was already consumed by the landfill fees in my case
- Landfill = see above. For excavation classes Z0 to Z1.1
- Pushing back soil: 1,500 euros
- Soil analysis / landfill assessment: 1,500–2,000 euros
- Permit fees based on building cost: 2,000 euros, for exempt buildings 100 euros
How much living space do you have in square meters? That’s not clear to me!
apokolok schrieb:
With the footprint and certainly two full stories in Baden-Württemberg, I come to about 145m² (1560 sq ft) of living space.
Even Heinz von Heiden won’t deliver that for 216k.
You need to carefully study the scope of work description and find the gaps. Is this going to be a shell house? I already see additional financing on the horizon if you can’t raise more money beyond my numbers.