ᐅ Structural calculations: before or after the building permit application?
Created on: 13 May 2016 09:39
J
Johann1986
Hello
We are currently in the process of planning our house. We have completed everything with the architect, which means the drawings are finished. The surveyor’s site plan has also been received by my architect. Now, the documents need to be submitted to the local building authority in Meinerzhagen (Märkischer Kreis, Sauerland). Since I am a complete beginner in this field, I apologize in advance.
I have a question regarding the structural engineer’s work. When does the structural engineer need to do their part? Before or after the building permit/planning permission is granted? Because I still need to organize quite a few things, such as excavation, checking prices for bricks, reinforcement steel mats, and so on.
We are currently in the process of planning our house. We have completed everything with the architect, which means the drawings are finished. The surveyor’s site plan has also been received by my architect. Now, the documents need to be submitted to the local building authority in Meinerzhagen (Märkischer Kreis, Sauerland). Since I am a complete beginner in this field, I apologize in advance.
I have a question regarding the structural engineer’s work. When does the structural engineer need to do their part? Before or after the building permit/planning permission is granted? Because I still need to organize quite a few things, such as excavation, checking prices for bricks, reinforcement steel mats, and so on.
S
Sebastian7913 May 2016 10:48andimann schrieb:
I would never build completely without a soil survey.I only had the one from the building area directly in front of the future house – it always depends on the location.
There is already a higher risk that way – I also wouldn’t build completely without one.