ᐅ Site development timing: Before building road construction or after debris removal?

Created on: 23 Jul 2020 06:59
S
Spike86
Good morning

Last week, we submitted the building permit application (as an expedited process, since there is no zoning plan). Now we are considering whether it makes sense or is even possible to connect the utilities before starting construction. The problem is that we have a flag lot, and the driveway runs to the back through the neighbor’s property. Once the construction road is set up, access to the utilities will be blocked, and we would only be able to connect them after construction is completed and the construction road is removed... wouldn’t that be too late? Isn’t a water connection needed beforehand so the plumbing contractor can test the toilet flushing? We are a bit unsure about this. Another issue is that the neighbor’s house is very close to the driveway and has a full basement. Therefore, part of the construction road would need to be reinforced. Do you have any tips on how to do this or if it is necessary? A friend once recommended these mats that distribute the weight. With these, an 11-ton (12 US ton) excavator (loaded up to 16 tons / 17.6 US tons) was able to pass without causing any damage.

It’s early in the morning, so I hope this is clear enough. If not, please ask, and I will try to explain it better.

Best regards and thanks in advance!

Technischer Bauplan/Site-Plan mit Straßenverlauf, Gebäuden, Zahnradsymbol und Beschriftungen.
S
Spike86
20 Sep 2020 18:57
Nida35a schrieb:

Or drilling rig for water heat pump?

??
Nida35a20 Sep 2020 19:20
Deep drilling rig?
J
Joedreck
20 Sep 2020 20:18
Planning a garden pump? Then have the well installed right away. Otherwise, use a hose with a 1000-liter (264-gallon) container and two large barrels that are always full. And install a submersible pump in the barrel.
11ant20 Sep 2020 20:35
Spike86 schrieb:

PS: It’s really annoying that you can’t send private messages.

I basically agree with the point, but precisely for that reason I feel the wording is actually counterproductive.
https://www.instagram.com/11antgmxde/
https://www.linkedin.com/company/bauen-jetzt/
S
Spike86
20 Sep 2020 20:49
11ant schrieb:

I basically agree with the content, but precisely for that reason, I think the wording does more harm than good

Seriously? Just one word is bothering you now?! Alright then...
Nida35a20 Sep 2020 21:10
You can also turn on the corresponding faucet and time how long it takes to fill a bucket with water. Between 10 and 20 seconds is fine; if it takes longer than 2 minutes, the pipe is likely clogged.