ᐅ Flush-mounted video doorbell in external wall insulation system. Should it be pre-installed or prepared in advance?
Created on: 22 Jun 2023 20:18
S
sysrun80The external thermal insulation composite system (ETICS) is currently being installed on the construction site. The 10cm (4 inches) insulation boards have already been attached.
I plan to install a flush-mounted video door station. The device is about 5cm (2 inches) deep and weighs around 2 kilograms (4.4 pounds).
Question: Is it better to prepare for this installation now (and if so, how), or can it be cut out later without major problems?
I plan to install a flush-mounted video door station. The device is about 5cm (2 inches) deep and weighs around 2 kilograms (4.4 pounds).
Question: Is it better to prepare for this installation now (and if so, how), or can it be cut out later without major problems?
sysrun80 schrieb:
Direct installation onto the masonry is probably difficult with a 5cm (2 inch) installation depth and 10cm (4 inch) insulation plus render.That’s why device "carriers" are used. Just google and find the appropriate model.Malunga schrieb:
That’s why equipment “carriers”
Just google it and find the appropriate modelAHAA! Thanks! Didn’t know something like that even existed 🙂
Similar topics