ᐅ When is the earliest time to start painting work?

Created on: 23 Mar 2020 21:25
A
Andre77
Hey,

from when is it possible to start the painting work in the finished living area (FLA)? Do certain drying processes need to be waited for? For example, only after the screed heating phase, or is that not relevant?

Thanks!
G
guckuck2
1 Apr 2020 08:31
If only textured plaster is to be applied, without any additional coating, I would definitely wait until all trades are finished. There is no possibility for corrections afterwards.
A
Andre77
1 Apr 2020 08:39
All right. By additional coating, do you mean applying paint over the textured finish? With the Knauf CompactColour spray, the paint is included with the textured finish and applied in one step.
G
guckuck2
1 Apr 2020 09:34
Yes, exactly.
If you paint normally and something goes wrong or gets messed up, you can simply paint over it again.
With textured roller plaster that is not meant to be painted, this is difficult. A spot repair would have a different color and surface texture, making it stand out.