Hi everyone, we are currently having our bathroom renovated for 13,000, and the tiler did not fully apply adhesive behind the tiles in the shower. I asked him about it, and he said, "With a 30cm x 60cm (12 inches x 24 inches) tile, this is not necessary." Is that correct? Whenever I search for tiling work, I see that adhesive should be applied across the entire surface, not just in spots.
Thanks in advance
Y
ypg
14 Apr 2024 22:17
PiMa2711 schrieb:

the tile was not fully covered with adhesive.
What do you mean exactly? Are you referring to the adhesive underneath?
H
hanghaus2023
19 Apr 2024 09:31
If you’re not able to describe it well, pictures can help.

How many points are there per tile?
B
Benutzer210
28 Apr 2024 18:29
PiMa2711 schrieb:

Hi everyone, we are currently having our bathroom done for 13,000 and the tiler didn’t apply adhesive over the entire back of the tile in the shower. I asked him about it, and he said “for a 30x60cm (12x24 inch) tile, that’s not necessary.” Is that correct? Whenever I look up tile work, it always shows the adhesive being spread fully, not just in spots.
Thanks in advance
hanghaus2023 schrieb:

If you’re not able to describe it well, pictures would help.

How many spots are there per tile?


The colleague actually described it correctly. When he says “full-surface adhesion,” he most likely means under the tile. I don’t know any tiler who applies adhesive on the face of the tile (above).