Osnabruecker5 Jun 2020 16:36The most expensive part is the additional costs...
Ordering an excavator, staking out, etc.
You can estimate concrete at €100 per cubic meter (approximately 100 USD per cubic yard). Plus a few hundred euros for steel reinforcement.
What about the structural engineering? How much rebar and what dimensions do you need?
Prices range from €1,000 (if the shell builder pours the foundation slab right next door) up to €5,000 extra for mobilization including a small quantity surcharge.
Ordering an excavator, staking out, etc.
You can estimate concrete at €100 per cubic meter (approximately 100 USD per cubic yard). Plus a few hundred euros for steel reinforcement.
What about the structural engineering? How much rebar and what dimensions do you need?