Hello everyone,
I have a quick question about volume calculation. I’m a bit stuck at the moment.
A slope is to be set back by 2.50 m (8 feet) at both the top and bottom edges over a length of 35 m (115 feet). The slope angle should remain the same as it is now. The slope ratio is 1:1.5. The length from the bottom edge to the top edge is approximately 5.50 m (18 feet).
If this area is excavated as described, how many cubic meters (cubic yards) or tons of soil would be removed?
Do you need any additional information for the calculation?
I appreciate any help.
Thank you!
Best regards
I have a quick question about volume calculation. I’m a bit stuck at the moment.
A slope is to be set back by 2.50 m (8 feet) at both the top and bottom edges over a length of 35 m (115 feet). The slope angle should remain the same as it is now. The slope ratio is 1:1.5. The length from the bottom edge to the top edge is approximately 5.50 m (18 feet).
If this area is excavated as described, how many cubic meters (cubic yards) or tons of soil would be removed?
Do you need any additional information for the calculation?
I appreciate any help.
Thank you!
Best regards
B
Bieber08151 Dec 2016 14:25Painkiller schrieb:
I think the OP means it differently there: [...] If he simply wants to move the ridge and eaves line 2.5m (8 feet) back, the base line will only be 2.5m (8 feet) as well... Now that you mention it... He should have made a sketch right away!