Hello,
(I hope I am in the right sub-forum),
Calcium sulfate screed (Knauf FE50) was installed in our house. After about 7 days of drying, the MobiHeat system was started. After rapid and strong heating, the house was cold again after 2 days. The MobiHeat unit was probably defective, so a replacement was installed, but it still does not work. (The temporary site power distribution box is now claimed to be the problem.)
-> What could have happened? Could the screed possibly be damaged? How can I, as a layperson, check this?
Best regards
(I hope I am in the right sub-forum),
Calcium sulfate screed (Knauf FE50) was installed in our house. After about 7 days of drying, the MobiHeat system was started. After rapid and strong heating, the house was cold again after 2 days. The MobiHeat unit was probably defective, so a replacement was installed, but it still does not work. (The temporary site power distribution box is now claimed to be the problem.)
-> What could have happened? Could the screed possibly be damaged? How can I, as a layperson, check this?
Best regards
S
Schischuh4 Mar 2023 07:38I will pay for the temporary construction electricity; it will probably cost a few hundred euros.