According to the factory plans, our roof eave at the gable side is supposed to extend 20cm (8 inches) beyond the outer edge of the external thermal insulation composite system. However, it was built with only a 3cm (1 inch) overhang from that point.
The appearance is now not as desired or planned, and we suspect that our construction company obviously cut costs on materials here.
Has anyone else been in a similar situation?
Did you request a price reduction? If so, how much? Did you receive it?
Or do you consider this being overly picky?
Best regards
jx7
The appearance is now not as desired or planned, and we suspect that our construction company obviously cut costs on materials here.
Has anyone else been in a similar situation?
Did you request a price reduction? If so, how much? Did you receive it?
Or do you consider this being overly picky?
Best regards
jx7
S
Sebastian7915 Apr 2016 11:49I don’t understand the problem – or is there a missing "c"?