ᐅ Renovation of an Existing Property – Our Journey to a Home

Created on: 13 Jun 2019 14:38
L
LordNibbler
Since returning to Wolfsburg in 2017, we had been searching for a property. Initially, we rented to take our time finding the right house and to test the real estate agents.

  • detached single-family house (so no semi-detached houses)
  • within walking distance to the city centers of Wolfsburg, Fallersleben, or Vorsfelde
  • for existing buildings, construction year from 1960 onwards, even if not renovated, as long as the structure justifies investment (otherwise you pay for poor renovations that need to be redone)
  • for new builds, located in a residential area with a coherent design concept (many new developments unfortunately look like model home neighborhoods where every option from the catalog has been used, but without creating a harmonious living environment)
  • a larger garden with usable space
  • no leasehold (common in this area)

Of course, properties meeting these criteria were expensive and scarcely available. The first viewings were disappointing:
  • 5-year-old house in a new development: walls with cracks, water stains (from the foundation slab), unoccupied, agent said normal settlement cracks (but wrong direction and too large), suspected upward ground movement due to Posidonia shale underground according to the land use plan and construction errors
  • 8-year-old house in the same development: not legally divided plot (3 houses on 2 plots), agent claimed legal division (sent documents with condominium declaration), neighborhood dispute (not ideal in a condominium under self-management)
  • 1950s development house: severe moisture problems in the basement including mold, agent already had an offer for exterior waterproofing (franchise concept with suction lance) which was not expensive, basement height under 1.8m (5 feet 11 inches), so not usable
  • 1950s development house: sold after only 2 years (hidden defects?), superficial renovation (cosmetic upgrades but original substructure)
  • several other houses that left little impression (location, layout, quality, price not suitable)

Then, at the beginning of 2018, an offer came up that didn’t fully meet our criteria but was in the same neighborhood.
  • built mid-1958
  • very high-quality construction and workmanship for the time
  • architect-designed house (engineer) for a medical professional (MD)
  • hillside location, split-level, integrated garage
  • district heating with concealed convectors
  • well maintained, so renovation was minimal (bathroom tiled + ceramics, new roof 2002, new windows 1995)
  • well-kept garden, granite paving
  • 165m² (1,776 sq ft) living space + 40m² (430 sq ft) utility space
  • 905m² (9,740 sq ft) leasehold plot at a dead-end street
  • 493,000 €



Garden in front of modern house with glass facade, garden bench, potted plants and palms

Two-story house made of light bricks with brown garage door, balcony plants and wooden fences.


Bright interior with wooden paneling, stairway to living room level.


The house was actually larger than we needed, but the structure and architecture were excellent. Renovations were manageable (utility lines easily accessible, partly in shafts), and the leasehold was acceptable because the owners had prepaid their installments (there was a discount), so the annual fee was only 500€ (~$540). The leaseholder is the city of Wolfsburg, which by statute only raises interest rates upon resale (not during the lease term or inheritance). When purchasing the plot, the land value is calculated by the benchmark land value minus the redemption amount and with a 15% discount. In mid-2017, the offer for the land was therefore 118,000€ (~$128,000) (with today’s benchmark land value it would be about 150,000€ (~$162,000)). This was a bargain for the area and was included in the asking price according to the agent.

Still, after a second viewing with experts (not appraisers), we found enough arguments (wall crack, renovation needs) to negotiate the price down to 420,000€. The public offer was then reduced to 435,000€ (~$470,000).

A financing broker secured approval from the local savings bank (Sparkasse) for the mortgage (leasehold is a bit special here, mostly local banks are familiar). It was feasible as a 20-year full repayment loan (leasehold agreement had to be valid for at least another 10 years), with a potential buffer to save up the land price.

But there was one issue: the over-90-year-old occupant. She was looking for an apartment in a senior residence (ground floor, lake view). Every week we heard it was only a matter of days until one would become available. In the end, by mid-April, we had a reservation with ownership transfer no later than December, possibly sooner. So we committed to financing and arranged the notary appointment...

...and then a week later, there was a request for a meeting (bypassing the notary). The niece and sister explained that the reservation was declared invalid. The time pressure was too great. It wasn’t certain the apartment would be available yet. They felt the elderly woman couldn’t be expected to move into a care home. They wanted a purchase contract with more time — about a year (implicitly without a strict limit).

We only had 6 months interest-free financing extension, but could imagine a few more months. However, only with financial compensation (1,500€/month rental cost difference). The counterproposal was to buy as planned but with ownership transfer only after the occupant moves out (essentially the right to live there). This was not acceptable (due to hardship rules; in the end you own the house but cannot evict the old resident). The only outcome was an informal understanding: we remained interested, please inform us when the senior residence is arranged; if we find something else in the meantime we will get back to you. The agent (VR-Bank) was not very pleased since it had been difficult to get the three women to agree before. It wasn’t her fault; the dossier was the best prepared with all necessary documents and missing items obtained promptly.

Two weeks later there was another interested party. Moral of the story: we successfully lowered the price for others but they moved in in October 2017.

Here are some floor plans of the property as inspiration for other house planners:



Architectural section drawing of a house with roof construction, rooms and dimensions.


The agent mentioned that in the residential area, maybe one property sells every 1–2 years. The rest are sold privately. Since we moved in, three houses have been demolished and replaced by new builds twice the size. Another is still a shell and is receiving a huge extension. None of these properties were publicly marketed...

...the search continues in the next post and how we finally found our home.
Hand-drawn floor plan of a building with several rooms, doors, and dimensions.

Floor plan of a house: detailed layout with walls, doors, stairs, rooms and dimensions.
LordNibbler29 Nov 2019 13:45
The drain is being replaced with a full-width ACO channel grate across the driveway.

Excavated construction pit with concrete channel, red barrier, orange tarp, pallets of paving stones on the left
(29.06.2019)

Construction site in front of a brick house: sandy pile, orange tarp, new paving stones, open entrance
(01.07.2019)

Then the ground is leveled and repaved:

Paving work in front of red brick house: sand mound, orange cover foil, bricks, manhole cover
(05.07.2019)

The last few meters take the longest:

Red brick wall with white garage door on the left and glass entrance on the right, paved walkway.
(24.08.2019)

When summer comes, the garden will turn green again:

Two-story house with red tiled roof, glass canopy, balcony, and white garden bench in the garden.
(26.07.2019)

Only the hawthorn in the middle is almost dead and poses a risk to the public path behind the hedge. The hazel tree on the left was unfortunately planted over the wastewater and stormwater pipes.

Garden with green lawn, hedge, and tree, house with gray tiled roof in the background.
(14.08.2019)

Rambazamba!

Garden with fallen branches, wood debris, and cut trees in front of white houses.
(05.10.2019)

Wow, the garden is big and bright.

Two white houses with dark roofs behind a tall hedge; garden with lawn and autumn trees.
(13.10.2019)
Finally space for fruit trees — only now the streetlamp shines into the bedroom.
LordNibbler29 Nov 2019 14:01
For now, one of the two radiators is missing in the living room, so it’s a good idea to have an additional alternative. This seems like a good spot for a stove since the chimney is already there and the basement fireplace is partially demolished.

White interior door on the left, parquet floor, wine rack with bottles on the right, circle on the floor made of tape strips
(07.07.2019)
However, there is still a light outlet in the wall, and the door opens in the wrong direction.

Tracing which wires go where to disconnect the wall socket:

Open ceiling wiring with several colored wires, connectors, and exposed ends.
(28.07.2019)

And documenting the result:

Sketch of a large circle with 9 spokes; on the right a legend with dots and drawings.


Reversing the door frame

Interior of a renovated apartment: open door, exposed brick, stairs, sunflower.
(04.08.2019)

Preparing the wall

Open wall opening in renovated room; raw wall construction, white cabinet door in the hallway.
(10.08.2019)

A bit of wallpaper and the work is barely visible now

Bright interior with an open door leading to wooden stairs; tiled floor behind the door, trash bin beside it.
(11.08.2019)

And as soon as the paint dries, the stove installation has really done a great job:

Modern wood stove with an open fire behind a glass door, toy lion on a wicker chair beside it.
(12.09.2019)
A
apokolok
29 Nov 2019 16:06
Cool documentary.
Unlike most readers, I immediately understood why some things weren’t done ‘correctly’ from the start.
@LordNibbler is having so much fun with all the work that he’s already looking forward to doing it again soon.
Winniefred29 Nov 2019 17:45
I’m joining the conversation here as well. I’ve only read it on my phone so far and find it very interesting. I’ll take a closer look over the weekend. We have also partially renovated our old building and are still working on it a bit. I can relate to many points mentioned here.

Thank you for the great documentation!
LordNibbler29 Nov 2019 18:04
Yes, it’s fun. I’m aware that some things are temporary or makeshift and will be removed later. But I use them as practice projects.

The alternative would have been a complete gut renovation before moving in, which would have required more financing and caused issues with the availability of construction companies.

Just as a comparison of what others are doing in the neighborhood:

Construction site with multi-story scaffolding around a partially finished building; barriers at the front.
Winniefred30 Nov 2019 09:43
Personally, I would have done the kitchen and bathroom properly from the start, but the way you handled it is perfectly fine. I also like that you’re preserving some things, like the beautiful hardwood flooring. May I ask what you paid for its refinishing per square meter? The fireplace looks really nice. I’m impressed that you were able to remove and reinstall the door frame without any issues. We ended up damaging ours during the removal.

Also, hats off for completing all the rough-in work. That’s something we didn’t dare to do in our house (at least not where the pipes disappear behind walls).

What are your plans for the coming months? And congratulations on the pregnancy, that’s an exciting time—especially with your first child. My only advice is to get as much done as possible before the birth, because afterward it’s often all hands full, and you’ll probably want to spend time together instead of dealing with construction debris.