I plan to have a prefabricated bungalow built next year in Lower Saxony, handling everything from planning to moving in. It should have approximately 150 m² (1,615 sq ft) of living space and, of course, be energy-efficient, including photovoltaic panels, electric storage, and geothermal heating. I already have a plot of land. What is a realistic timeframe for the entire process, including planning, building permit / planning permission, and the complete construction until moving in? Are there differences between providers?
xMisterDx schrieb:
The local painter is ignoring the last 10% of the work and simply doesn’t answer the phone anymore, even though parts were painted very poorly.He should really familiarize himself with the building code if he thinks he can effectively and silently opt to offset the retention by ghosting the customer. He can’t.https://www.instagram.com/11antgmxde/
https://www.linkedin.com/company/bauen-jetzt/