Hello everyone,
We are going to buy a prefabricated timber frame house, delivered with the technical finish. Q2-level jointing. Now there are still visible joints at the ceiling/wall drywall transitions everywhere. In my understanding, Q2 jointing should include filling such joints, or am I mistaken?
Thank you for your answers.
We are going to buy a prefabricated timber frame house, delivered with the technical finish. Q2-level jointing. Now there are still visible joints at the ceiling/wall drywall transitions everywhere. In my understanding, Q2 jointing should include filling such joints, or am I mistaken?
Thank you for your answers.
Lux1108 schrieb:
Now there are still joints visible everywhere at the ceiling/wall drywall transitions.For us, everything was “all inclusive,” and joint tape was “painted on” (blue adhesive) at the transitions.