another moisture question again 😀 But please don’t stone me 🙂
On September 27, our cement screed was installed over the underfloor heating (thickness 6.5cm (2.6 inches)). The handover has already taken place. Now we are planning to install vinyl flooring starting from December 13 (click system, thickness 5mm (0.2 inches), underlayment 1.5mm (0.06 inches)). The screed has had roughly 11 weeks to dry. The underfloor heating was running, and dehumidifiers were also used.
Should I have a CM measurement done again after this time?
another moisture question again 😀 But please don’t stone me 🙂
On September 27, our cement screed was installed over the underfloor heating (thickness 6.5cm (2.6 inches)). The handover has already taken place. Now we are planning to install vinyl flooring starting from December 13 (click system, thickness 5mm (0.2 inches), underlayment 1.5mm (0.06 inches)). The screed has had roughly 11 weeks to dry. The underfloor heating was running, and dehumidifiers were also used.
Should I have a CM measurement done again after this time?
R
readytorumble4 Dec 2017 14:41Hi,
none of us can look inside your screed. We also don’t know what type of screed you have or how well it has dried.
Furthermore, we don’t know what the drying program for your underfloor heating looked like. There are many different ones.
11 weeks might have been enough, but it might not have.
none of us can look inside your screed. We also don’t know what type of screed you have or how well it has dried.
Furthermore, we don’t know what the drying program for your underfloor heating looked like. There are many different ones.
11 weeks might have been enough, but it might not have.