ᐅ Installing Flooring as a DIY Project After the Screed Layer
Created on: 26 Jun 2023 16:53
D
Doreen33Hello,
Our construction company is currently working on the interior finishing of our house. The screed has already been laid.
When were you able to start your own work on flooring installation (tiles/click vinyl)? Of course, before the kitchen is installed and before our staircase is built. We would like to start as soon as possible.
Our construction company is currently working on the interior finishing of our house. The screed has already been laid.
When were you able to start your own work on flooring installation (tiles/click vinyl)? Of course, before the kitchen is installed and before our staircase is built. We would like to start as soon as possible.
W
WilderSueden26 Jun 2023 17:09Has the CM measurement already been done? Or is the contractor passing that responsibility on to you since they won’t be installing the floors anyway?
Screed drying generally takes about 6 weeks. I would recommend installing the flooring only after the contractor’s workers have left, to avoid any disputes later if there are scratches or if someone walks on freshly laid tiles too early.
Screed drying generally takes about 6 weeks. I would recommend installing the flooring only after the contractor’s workers have left, to avoid any disputes later if there are scratches or if someone walks on freshly laid tiles too early.
Normally, a general contractor wants a final inspection before such major electrical work is carried out.
The fact that the interior doors are still to be installed does not really stand in the way of this.
I specifically had a partial handover, because I still had electrical work and exterior plastering to be done.
The fact that the interior doors are still to be installed does not really stand in the way of this.
I specifically had a partial handover, because I still had electrical work and exterior plastering to be done.
X
xMisterDx26 Jun 2023 23:46I would install the flooring only after painting is done. It makes life much, much easier. The hallway and kitchen are obviously exceptions.
However, you need to be very sure that you can complete this on time; otherwise, you might disrupt the construction schedule, which can also lead to higher costs.
However, you need to be very sure that you can complete this on time; otherwise, you might disrupt the construction schedule, which can also lead to higher costs.
Doreen33 schrieb:
From when were you able to start your own work on flooring installation (tiles/click vinyl)?AFTER the measurements and approval in coordination with the general contractor.WilderSueden schrieb:
Has the CM measurement already been done? Or is the main contractor now passing that responsibility on to you, since they aren’t installing the floors anyway?
Screed drying usually takes about 6 weeks. I would recommend installing the flooring only after the contractor’s tradespeople have finished, to avoid any disputes later if there are scratches or someone walks over newly laid tiles too soon. The CM measurement will be done by the main contractor in the next few days. Thanks for the information.