Hello everyone,

we are building a house with a concrete slab foundation in Hesse.

Our construction has started, and right from the first step, I encountered the following issue.

The shell construction company installed the sewer pipes under the slab without a sand bed. The pipes were laid directly on the gravel base 0/45 and quartz sand was poured around and on top of the pipes. Then gravel was placed over this.

Of course, I was foolish not to intervene immediately, and the next day the concrete slab was already poured.

Because we also have a Kessel Pumpfix installed in the slab for backflow protection, there are several pipes under the slab. I fear that with this installation method without a proper sand bed, the pipes will not last long.

I reported this to the project manager of the builder. He said he is not happy about it and will forward it to the technical department for review. After consulting a homeowners' advisor, I was told this is a construction defect and that I should file a defect notice. I did so today and am now waiting for a response.

I suspect the builder might try to dismiss the issue by relying on a leakage test...

Can anyone with experience tell me if this already qualifies as a construction defect? Has anyone here had a similar situation on this forum?

I also don’t know what possible remedies are available. Removing the concrete slab is rather unrealistic. Perhaps extended liability from the builder for this work and proof of proper installation of the drainage system?

Please do not give advice about poor planning, lack of supervision, or similar criticisms on my part. I am quite frustrated and don’t need comments like that.

Maybe I am overthinking this and it is not a big deal. I honestly don’t know.

I hope future homeowners reading this won’t make the same mistake as I did…

Attached are some photos.

I appreciate any help and tips.

Baustelle mit Grube, orange PVC-Rohre, Werkzeuge, Schaufeln und Bauarbeiter im Hintergrund


Baugrube mit orange PVC-Rohren, schwarzem Schlauch, Kiesuntergrund und Arbeitern im Hintergrund.


Bauarbeiter verlegt orange Abwasserrohre in einer Kiesgrube; Werkzeuge und Schacht sichtbar.


Baugrube mit orangefarbenen PVC-Rohren, schwarzen Schläuchen und Werkzeugen auf einer Baustelle.


Baugrube mit orangefarbenem Rohr, schwarzem Schlauch, Kies, Holzbretter und roten Schnüren.


Grabungsbereich auf einer Baustelle mit orangefarbenen PVC-Rohren, Schaufeln, Spaten und roter Markierungslinie.


Bewehrungsstahl-Gitter über Fundamentrahmen auf Baustelle, Erdaushub und Kies daneben.
Knöpfchen24 Jul 2019 20:16
Once the concrete slab is completed, you should already have the documentation for the grounding system according to DIN 18014 handed over to you in both written and visual form.
Carefully read through the DIN online.
I almost bet it will leave you gasping for breath.