ᐅ House Photos Discussion Corner – Share Your Home Pictures!

Created on: 25 Nov 2015 10:27
K
Koempy
Hello,

It would be really great if everyone here could just post one or a few pictures showing the current state of their house.

I'll start right away.

For renovations, it’s best to provide a comparison of before and after the remodeling.

Before March 2014:



After May 2015:

N
Nordlys
3 May 2019 20:58
Big enough for 2 people. Really. For the two of us, smaller works fine.
B
Bookstar
3 May 2019 21:14
I find 165 m² (1776 sq ft) plus a basement ideal for two people. With children, the space needs to be significantly larger; I think 250 m² (2691 sq ft) is ideal. But I need my own space.
N
Nordlys
3 May 2019 21:17
She is building in Rostock, which is in the north. She is from Fehmarn. We carry space within ourselves, in our souls, so smaller rooms don’t bother us as much. We can also get dressed outside of walk-in closets, and we can cook without an island, .....
opalau4 May 2019 12:38
Work is even being done on Saturday. The ground floor is almost finished; a few steel columns still need to be clad, the insulation is already in place, and the facing bricks will be delivered next week. Currently, the delivery date for the ceiling panels is still pending.

Bird’s-eye view: Construction site with shell construction, building materials, truck, and construction tools


Bird’s-eye view: Shell construction with concrete walls, workers, building materials, and trucks.


Bird’s-eye view: Construction site with white shell, interior walls, and building materials.
I
ivenh0
4 May 2019 19:38
On Monday, the tilers will start work here.
The materials are already on site.
For the large bathroom, 60x120cm (24x48 inches) tiles in two colors, and for the other two rooms, 60x60cm (24x24 inches) tiles, same for walls and floors...

Große graue Fliesenplatte liegt flach auf blauem Schutzvlies in einer Werkstatt.

Großformatige, verpackte Fliesenplatte in Karton, umgeben von blauer Folie und grünen Spanngurten.

Eine große graue Bauplatte liegt schräg auf einem Palettenstapel; dahinter Beton-Estrich-Säcke.

Große Fliesenplatten liegen auf Paletten, umgeben von Verpackung und blauer Folie im Lager.
S
Snowy36
5 May 2019 21:07
opalau schrieb:

They are even working on Saturday here. The ground floor is almost finished, a few steel columns still need cladding, the insulation is already prepared, and the brick veneer will be installed next week. Currently, the delivery date for the ceiling panels is still missing.

It looks huuuge