Hello building experts,
I want to build a KfW55EE bungalow with 100m2 (approximately 1,076 sq ft) turnkey with Heinz von Heiden in Saxony.
The plot is provided by my parents, 1800m2 (about 30x60m / 98x197 ft), relatively flat.
A sewage connection was laid and paid for years ago. A few small shrubs and trees need to be removed.
I am 52 and my wife is 47 years old, so we don’t have much time left to pay off a loan.
I currently earn €3000 and my wife €1500. We still live in Bavaria at the moment and will have to change jobs anyway because we need to move. We currently rent and pay €1250 including utilities for 115m2 (about 1,238 sq ft).
We have around €100,000 in savings, but we only want to use about €45,000 as equity in the financing to keep sufficient reserves for the upcoming move and any unforeseen expenses.
The turnkey bungalow, including groundwork and soil survey, should cost €178,000. We plan to do some work ourselves, such as painting walls and installing the flooring. We also plan to build a prefabricated garage, 6x4m (about 20x13 ft), for one car, bicycles, and garden furniture storage (around €10,000).
What additional building-related costs should we plan for, and which of these costs should be included in the financing?
We would be very grateful for any advice.
I want to build a KfW55EE bungalow with 100m2 (approximately 1,076 sq ft) turnkey with Heinz von Heiden in Saxony.
The plot is provided by my parents, 1800m2 (about 30x60m / 98x197 ft), relatively flat.
A sewage connection was laid and paid for years ago. A few small shrubs and trees need to be removed.
I am 52 and my wife is 47 years old, so we don’t have much time left to pay off a loan.
I currently earn €3000 and my wife €1500. We still live in Bavaria at the moment and will have to change jobs anyway because we need to move. We currently rent and pay €1250 including utilities for 115m2 (about 1,238 sq ft).
We have around €100,000 in savings, but we only want to use about €45,000 as equity in the financing to keep sufficient reserves for the upcoming move and any unforeseen expenses.
The turnkey bungalow, including groundwork and soil survey, should cost €178,000. We plan to do some work ourselves, such as painting walls and installing the flooring. We also plan to build a prefabricated garage, 6x4m (about 20x13 ft), for one car, bicycles, and garden furniture storage (around €10,000).
What additional building-related costs should we plan for, and which of these costs should be included in the financing?
We would be very grateful for any advice.
BertramK schrieb:
Yes, the ground slab and groundwork are included. However, it will hardly be possible to keep the price offered by Heinz von Heiden. Even €2,000 per square meter (about $185 per square foot) will hardly be achievable, especially given current prices. Have the construction specifications, for example, checked by a building consultant.
BertramK schrieb:
We are currently renting and paying 1250€ including utilities for 115m² (1235 sq ft).In which areas are you planning to downsize?https://www.instagram.com/11antgmxde/
https://www.linkedin.com/company/bauen-jetzt/
P
Pinkiponk19 Jun 2021 19:56BertramK schrieb:
Hello Pinkiponk,
Thank you for your reply 🙂 Feel free to share your cost list.
How far along are you with your build? Who are you building with? Simply remove any items from the list that are not relevant for you. Once I have the individual amounts in euros, I can provide those as well. It will take a little longer though.
We are building in the Leipzig district. Would you like to tell us which region you will be building in?
| Assignment of house number |
| Transfer of data from cadastral map |
| Certificate of preemptive purchase rights |
| Court fees for land registry notice |
| Entry in land registry, deletion of notice |
| Fees for notarizing land charge |
| Review of house offer/contract |
| Building encumbrance register information |
| Property maintenance until construction start |
| Kitchen |
| Garage/carport with workshop/tool shed |
| Exterior landscaping |
| Garden and tool shed |
| Refreshments for construction workers |
| Tips for construction workers |
| Double burden of rent and loan payments |
| Moving costs |
| Construction supervisor/building expert/surveyor |
| Topping out ceremony |
| Housewarming |
| Building permit (simple?) |
| Structural engineer |
| Police street closure |
| Confirmation of KfW funding criteria |
| Lawn/hedges/shrubs |
| Mailbox |
| Earthworks | |||||||||||||||||||||
| Gravel (clean layer) | |||||||||||||||||||||
| Slab foundation | |||||||||||||||||||||
| Foundation formwork | |||||||||||||||||||||
| Scaffolding | |||||||||||||||||||||
| Shell construction | |||||||||||||||||||||
| Roof frame | |||||||||||||||||||||
| Roof tiles | |||||||||||||||||||||
| Drainage | |||||||||||||||||||||
| Concrete | |||||||||||||||||||||
| Eaves flashing | |||||||||||||||||||||
| Structural calculations | |||||||||||||||||||||
| Building materials (gravel/sand) | |||||||||||||||||||||
| Scaffolding | |||||||||||||||||||||
| Chimney | |||||||||||||||||||||
| Construction electricity/water supply | |||||||||||||||||||||
Building application and architectural services
|
| Roof pitch 30° instead of 22° | ||||||||||||||||||||||||||||||||||||||||||||
| Storey height increase by 20cm (8 inches) | ||||||||||||||||||||||||||||||||||||||||||||
| Additional interior wall | ||||||||||||||||||||||||||||||||||||||||||||
| Additional interior door | ||||||||||||||||||||||||||||||||||||||||||||
| Additional interior glass door | ||||||||||||||||||||||||||||||||||||||||||||
| Additional shower | ||||||||||||||||||||||||||||||||||||||||||||
| Windows according to our plan | ||||||||||||||||||||||||||||||||||||||||||||
| Electric roller shutters instead of manual | ||||||||||||||||||||||||||||||||||||||||||||
| Somfy Tahoma box (central control) | ||||||||||||||||||||||||||||||||||||||||||||
| Intercom system | ||||||||||||||||||||||||||||||||||||||||||||
| Network sockets | ||||||||||||||||||||||||||||||||||||||||||||
| High voltage connection | ||||||||||||||||||||||||||||||||||||||||||||
| Additional outdoor water tap | ||||||||||||||||||||||||||||||||||||||||||||
| Floor drain | ||||||||||||||||||||||||||||||||||||||||||||
| Vapor-permeable wall construction | ||||||||||||||||||||||||||||||||||||||||||||
| Additional cost for underfloor heating | ||||||||||||||||||||||||||||||||||||||||||||
| Flat plate solar collectors | ||||||||||||||||||||||||||||||||||||||||||||
| Chimney | ||||||||||||||||||||||||||||||||||||||||||||
| Photovoltaic system | ||||||||||||||||||||||||||||||||||||||||||||
| Plastering work | ||||||||||||||||||||||||||||||||||||||||||||
| Wallpapering | ||||||||||||||||||||||||||||||||||||||||||||
| Floor coverings ground floor 65sqm (700 sq ft) | ||||||||||||||||||||||||||||||||||||||||||||
| Floor coverings upper floor 57sqm (613 sq ft) | ||||||||||||||||||||||||||||||||||||||||||||
| Retractable attic ladder | ||||||||||||||||||||||||||||||||||||||||||||
| Window grids for all windows/doors | ||||||||||||||||||||||||||||||||||||||||||||
| Window surrounds | ||||||||||||||||||||||||||||||||||||||||||||
| Window shutters | ||||||||||||||||||||||||||||||||||||||||||||
| Slab foundation | ||||||||||||||||||||||||||||||||||||||||||||
| Permit fees | ||||||||||||||||||||||||||||||||||||||||||||
| Structural and, if necessary, verification calculations | ||||||||||||||||||||||||||||||||||||||||||||
| Surveying and fees | ||||||||||||||||||||||||||||||||||||||||||||
| Construction site setup | ||||||||||||||||||||||||||||||||||||||||||||
| Construction electricity, water, and energy costs | ||||||||||||||||||||||||||||||||||||||||||||
| Earthworks | ||||||||||||||||||||||||||||||||||||||||||||
| Sewer work | ||||||||||||||||||||||||||||||||||||||||||||
| Waste disposal, container | ||||||||||||||||||||||||||||||||||||||||||||
| House connections | ||||||||||||||||||||||||||||||||||||||||||||
| Soil test, regulations, geotechnical report | ||||||||||||||||||||||||||||||||||||||||||||
| Building application and architectural services | ||||||||||||||||||||||||||||||||||||||||||||
| Structural calculations | ||||||||||||||||||||||||||||||||||||||||||||
| Custom exterior wall design | ||||||||||||||||||||||||||||||||||||||||||||
| Preparation | ||||||||||||||||||||||||||||||||||||||||||||
| Material selection | ||||||||||||||||||||||||||||||||||||||||||||
| Building permit fee Saxony |
| Front door |
| Doors |
| Windows |
| Roof windows |
| Interior plaster |
| Paint |
| Tile adhesive |
| Tiles |
| Fireplace + connection |
| Paint |
| Stairs |
| Window sills |
| Exterior plaster |
| Gutters |
| Laminate flooring |
| Heating system (gas condensing boiler with solar thermal) | ||||||||||||||||||
| Heating system accessories (buffer tank, etc.) | ||||||||||||||||||
| Underfloor heating | ||||||||||||||||||
| Thermostats | ||||||||||||||||||
| Hot water pipes | ||||||||||||||||||
| Wastewater pipes | ||||||||||||||||||
| Washbasin | ||||||||||||||||||
| Fittings | ||||||||||||||||||
| Toilet | ||||||||||||||||||
| Bathtub + shower tray | ||||||||||||||||||
Towel radiator
|
BertramK schrieb:
Yes, the concrete slab and groundwork are included Up to 30cm (12 inches), no more.
@Pinkiponk
There seems to be a lot of confusion. I think this is misleading.