Hello,
I am sharing the floor plan as we have developed it. Perhaps there are some suggestions?
The dimensions are interior room sizes, with a wall thickness of 10 cm (4 inches) assumed. Depending on the actual wall thickness, adjustments will be necessary.
Plot size: 1200 sqm (12,917 sq ft)
Slope: no
Floor area ratio / plot ratio: unknown, but not important
Building permit / planning permission, building line and boundary: there is no development plan; the new house will stand where our current house is (only the distance to the neighbor must be increased to 3 m (10 feet)), which according to the responsible building authority is no problem
Edge development: no
Number of parking spaces: garages already exist and will remain
Number of floors: bungalow, single story
Roof type: gable or hip roof
Style?
Orientation: roof facing east-west
Other constraints: the plot is only about 16 m (52 feet) wide, so the house must not be wider than about 10 m (33 feet) in this direction
Homeowners’ requirements
Style, roof type, building type: bungalow, preferably gable roof
Basement, floors: no basement, only 1 floor, storage room in the attic
Number of occupants, age: 2 persons, 55 and 58
Space needs on the ground floor: about 100 sqm (1,076 sq ft)
Office: family use or home office: no
Overnight guests per year: 2 grandchildren occasionally, father occasionally
Open or closed layout?
Conservative or modern construction: rather conservative
Open kitchen, cooking island: open kitchen
Number of dining places: 4
Fireplace: yes, definitely
Music/sound system wall: no
Balcony, roof terrace: no
Garage, carport: already existing
Utility garden, greenhouse: garden already established
House design
Designed by:
- Do-It-Yourself, created based on various templates
What do you like most? Why?: large window front on the south side with direct access to the garden
What do you not like? Why?
- Corner in the hallway between utility room and bedroom, but the hallway should remain large to avoid bumping into each other and to have enough space for motorbike gear,
- I would prefer the fireplace positioned more in the corner between kitchen and living area, but that conflicts with neighbor distance regulations and emissions protection
Price estimate according to architect/planner: initial offers are around €190,000 for about 110 sqm (1,184 sq ft), but changes are still needed
Personal price limit for the house, including fittings: should not exceed €200,000 plus additional construction costs; equipment is already taken care of
Preferred heating system: gas condensing boiler, since gas supply is already connected
If you had to give up anything, which details/expansions
- Could you give up: nothing
- Cannot give up: underfloor heating, large window front, fireplace
Why did the design turn out as it is?
All wishes were implemented as far as possible
What is the most important/basic question about the floor plan in 130 characters?
Is there anything that doesn’t work at all? Any room for improvement? What would you do differently? Where could it be optimized?
I am sharing the floor plan as we have developed it. Perhaps there are some suggestions?
The dimensions are interior room sizes, with a wall thickness of 10 cm (4 inches) assumed. Depending on the actual wall thickness, adjustments will be necessary.
Plot size: 1200 sqm (12,917 sq ft)
Slope: no
Floor area ratio / plot ratio: unknown, but not important
Building permit / planning permission, building line and boundary: there is no development plan; the new house will stand where our current house is (only the distance to the neighbor must be increased to 3 m (10 feet)), which according to the responsible building authority is no problem
Edge development: no
Number of parking spaces: garages already exist and will remain
Number of floors: bungalow, single story
Roof type: gable or hip roof
Style?
Orientation: roof facing east-west
Other constraints: the plot is only about 16 m (52 feet) wide, so the house must not be wider than about 10 m (33 feet) in this direction
Homeowners’ requirements
Style, roof type, building type: bungalow, preferably gable roof
Basement, floors: no basement, only 1 floor, storage room in the attic
Number of occupants, age: 2 persons, 55 and 58
Space needs on the ground floor: about 100 sqm (1,076 sq ft)
Office: family use or home office: no
Overnight guests per year: 2 grandchildren occasionally, father occasionally
Open or closed layout?
Conservative or modern construction: rather conservative
Open kitchen, cooking island: open kitchen
Number of dining places: 4
Fireplace: yes, definitely
Music/sound system wall: no
Balcony, roof terrace: no
Garage, carport: already existing
Utility garden, greenhouse: garden already established
House design
Designed by:
- Do-It-Yourself, created based on various templates
What do you like most? Why?: large window front on the south side with direct access to the garden
What do you not like? Why?
- Corner in the hallway between utility room and bedroom, but the hallway should remain large to avoid bumping into each other and to have enough space for motorbike gear,
- I would prefer the fireplace positioned more in the corner between kitchen and living area, but that conflicts with neighbor distance regulations and emissions protection
Price estimate according to architect/planner: initial offers are around €190,000 for about 110 sqm (1,184 sq ft), but changes are still needed
Personal price limit for the house, including fittings: should not exceed €200,000 plus additional construction costs; equipment is already taken care of
Preferred heating system: gas condensing boiler, since gas supply is already connected
If you had to give up anything, which details/expansions
- Could you give up: nothing
- Cannot give up: underfloor heating, large window front, fireplace
Why did the design turn out as it is?
All wishes were implemented as far as possible
What is the most important/basic question about the floor plan in 130 characters?
Is there anything that doesn’t work at all? Any room for improvement? What would you do differently? Where could it be optimized?
motorradsilke schrieb:
I am currently at the stage where the planning is basically finished.What do you mean by "basically" – do you have the building permit / planning permission but not the detailed drawings yet?https://www.instagram.com/11antgmxde/
https://www.linkedin.com/company/bauen-jetzt/
M
motorradsilke19 Mar 2021 18:12We have now submitted the floor plan shown above to the building authority, and the approval will be issued on Monday (I spoke with them today). It will then be officially approved. Next week, we will coordinate the further schedule with the contractor, and construction will start as soon as possible. However, we have not made any selections yet; the first appointment for interior doors is scheduled for early April. The window installer had planned to wait until the worst phase of the coronavirus pandemic passed, but that will no longer be the case. We had the first meeting with the electrician; the selections for that will be made closer to the time.
That doesn’t mean, of course, that minor changes can’t still be made if we think of anything else.
That doesn’t mean, of course, that minor changes can’t still be made if we think of anything else.
motorradsilke schrieb:
It is approved now. Next week, we will clarify the further schedule with the contractor, and construction will start as soon as possible. However, we haven’t finalized any samples yet,I’m glad to hear about the approval. However, it’s about time to work on the detailed plans—because remember, anything not clearly specified will be improvised "according to recognized drywall installation standards."https://www.instagram.com/11antgmxde/
https://www.linkedin.com/company/bauen-jetzt/
M
motorradsilke19 Mar 2021 20:0611ant schrieb:
I’m glad to hear the approval. However, it’s also time to work on detailed plans – because remember, anything not precisely drawn will be improvised "according to recognized dry construction standards." What do you mean by detailed plans?
Once the building permit / planning permission is granted, there is a stop on changes for you, and then the general contractor prepares detailed plans and orders the materials.
A plan for the foundation slab, basic piping, and masonry then gets circulated on the construction site in a sealed plastic cover. We kept ours as a keepsake—where has it actually gone?
A plan for the foundation slab, basic piping, and masonry then gets circulated on the construction site in a sealed plastic cover. We kept ours as a keepsake—where has it actually gone?
M
motorradsilke19 Mar 2021 20:22So, is this what the company refers to as construction execution planning?